From: Jennifer Cline
Sent: Thu Jun 25 16:00:55 2015
To: Christine Hein
Cc: Dan Huff
Subject: FW: WWTP Headworks pH Probe
Importance: Normal
Attachments: Picture (Device Independent Bitmap) 1.jpg; Mollala pH.xlsx; Mollala pH.pdf; FYI – this work is as part of the NPDES requirements. We will also have the required temperature gauge at the river up and running once the permanent installation is complete and the VPN connection is made. Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676 From: Randy Bos [mailto:rjb@industrialsystems-inc.com] Sent: Thursday, June 25, 2015 3:47 PM To: Jennifer Cline Cc: Troy Collison; John Sowards Subject: WWTP Headworks pH Probe Hi Jennifer, This morning John and I were out at the treatment plant. He was checking control panels for spare relays and terminals for the drive signal modifications and I picked up the Lab Data. The pH meter values are tracking the grab sample pH values very well. I would recommend proceeding with the installation based on the past several weeks of data. Please review the attached table and chart. Also is a pdf copy if you need to send it off to DEQ. Thanks for gathering the data for us. Randy Randal J. Bos 5835 NE 122nd Avenue, Suite #110 Portland, Oregon 97230 http://www.industrialsystems-inc.com Phone: 503.262.0367 x- 310 Cell: 360.904.7087 Fax: 503.262.0371 CCB # 196597 WA #INDUSSI880K9