Hi Gerald,

Here are the comments back on the structures. Do they address your concerns?

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Hazen Hyland [mailto:hazenh@westernwoodstructures.com]

Sent: Monday, July 27, 2015 11:39 AM

To: jcline@cityofmolalla.com

Cc: Craig Loughridge <pioneer@bybryson.com>

Subject: updated drawings

Hi Jennifer,

Thanks for the phone message last Friday. Here are the updated drawings.

A) WWS has added the hardware callout for the deck attachment. This was missing…good catch.

B) Regarding the rebar question on the abutment rebar, basically every dot is a horizontal strand of rebar, and the vertical rebar (that’s shown) have various 15” or 16” on-center spacing.

Since the calc package for the bridge didn’t change, I didn’t have the engineer stamp these drawings. The Engineer of Record for the bridge is also out sick today and maybe tomorrow, so I won’t be to have them stamped until he returns, if needed.

If you or the reviewer has any questions, feel free to give me a call. Thanks for your initial review Jennifer.

Regards,

Hazen Hyland, Bridge and International Sales

ph (800) 547-5411 fx (503) 692-6434

20675 SW 105th Ave

Tualatin, OR 97062

www.westernwoodstructures.com

image

CONFIDENTIALITY WARNING: This communication contains confidential information intended only for the person(s) to whom it is addressed. If you have received this message in error, please notify the sender immediately, and delete this document. Any other action such as redistribution, copying, or disclosure is strictly prohibited.