From: Jennifer Cline
Sent: Thu Nov 13 16:15:56 2014
To: Heather Penni
Cc: Dan Huff; Sadie Cramer
Subject: FW: Streets and Water SDC project descriptions
Importance: Normal
Attachments: Serction St & Waterline Replacement Engineering Proposal.pdf; Hi Heather, Attached is the proposal for the design work utilizing SDC funding from Transportation, Water, Storm and Sanitary. Regarding construction, the plan is to have the city do the water line replacement work and contract the work on Section St. Please let me know if you want to sit down and discuss this further. Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676 From: Hassan Ibrahim [mailto:hai@curran-mcleod.com] Sent: Wednesday, November 05, 2014 12:43 PM To: 'Jennifer Cline' Cc: 'Garrett Edmunds'; 'Heather Penni' Subject: RE: Streets and Water SDC project descriptions Hi Jennifer, Attached please find the engineering proposal for Section Street Reconstruction and the waterline replacement on W 3rd, W 4th & Metzler Ave. Please let us know how to proceed. Regards, -------------------- Hassan Ibrahim, P.E. CURRAN-McLEOD, INC. 6655 SW Hampton St, Ste. 210 Portland, OR 97223 Tel: 503-684-3478 Fax: 503-624-8247 Cell: 503-807-2737 email: hai@curran-mcleod.com From: Jennifer Cline [mailto:jcline@cityofmolalla.com] Sent: Tuesday, October 28, 2014 12:19 PM Cc: Garrett Edmunds; Heather Penni Subject: Streets and Water SDC project descriptions Hi Hassan, Below are the project descriptions for both Water and Streets SDC Funds. Regarding the Water SDC Funding, what repairs are permitted in conjunction with the Water SDC Funding. Would this include street repairs such as; full design width paving, sidewalks and ADA Ramps? Please provide a proposal for the design of the Water & Street SDC funding projects. The City will advertise only for the Section Street project. Water SDC Funding Metzler Water Line · Begin replacement at Metzler Ave. and West Main Street to Metzler and 7th. · Existing water line is 6 inch, consisting of steal, AC, and plastic water lines. · Replace with 8 inch plastic. 3rd St. Water line · Begin replacement at Lola Ave. and 3rd to Berkley and 3rd. · Existing water line is 4 inch steal. · Replace with 6 inch plastic. 4th St. Water line · Begin replacement at Metzler Ave. & 4th to Hart & 4th · Existing water line is 4 inch steal. · Replace with 6 inch plastic. Transfer Trout Creek Water Rights to Molalla River & Install Trout Creek Flow Monitoring Station. Street SDC Funding Section Street from S. Molalla to Hart · Full width ACP Level 2 pavement rebuild from Molalla to Hart · Install sidewalk and ADA ramps upgrades · PCP pavement design at the intersection of Section and Hart up to 50-ft in every direction. · Install Storm Collection System, combine with a Storm SDC Funds to extend storm line to a drainage outlet or existing system. Existing storm system is abandoned. · Advertise RFB Regards, Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676