From: Jennifer Cline

Sent: Fri Jun 19 14:25:26 2015

To: Heather Penni

Cc: Dan Huff

Subject: FW: PGE line extension fees

Importance: Normal

Attachments: image001.gif; image003.jpg; JOBCOSTM1594768.pdf;

 

image

Heather,

This is for the lighting on the URP for Heintz St. I’m assuming Dan will need to sign this for approval.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Sharar, Darlene K. [mailto:ShararD@hdjdg.com]

Sent: Friday, June 19, 2015 11:13 AM

To: Jennifer Cline

Cc: Hash, Kenneth F.

Subject: PGE line extension fees

Hello Jen –

Ken asked that I provide you information on the PGE costs associated with the Heintz Street illumination.

Attached is the form for the City to fill out and it includes the total cost to be paid by the City of $4,623.28.

PGE needs the payment in advance of their ordering the project materials. PGE did explain what is associated with the $4,623.28 fee:

The Line Extension is for material and labor (including man hours and equipment) to install the circuit. The allowance is based on the wattage of the fixture used (the higher the wattage the higher the allowance) : Line Extension – Allowance = Total Cost $4,623.28.

Let me know if you have additional questions or how I can further assist!

Darlene K. Sharar | Construction Management

HDJ DESIGN GROUP, PLLC

Engineers | Landscape Architects | Planners | Surveyors

314 W. 15th Street, Vancouver, WA 98660

Phone: 360/695-3488 Fax: 360/695-8767

ShararD@hdjdg.com

From: Sharar, Darlene K.

Sent: Wednesday, June 10, 2015 3:46 PM

To: 'Luanne Berkey'

Cc: Hash, Kenneth F.

Subject: FW: Project Packet - Urban Renewal Project - Heintz St. PGE Streetlight #M1594768

Good afternoon Luanne –

I was asked to review the attachments and do have one question for you.

Could you provide a break down for the line extension cost of $4,860.12? If the associated breakdown was included, I overlooked it and do apologize!

For this and future projects, I would like an understanding of what goes into the PGE line extension cost for new lighting systems – such as:

ü Are there materials, labor, equipment?

ü Is the cost different depending on the lighting option that is selected?

ü Is the cost different for public and private illumination systems?

ü Is there any other insight that you can offer to help educate me?

Thank you for your continued assistance and have a wonderful evening! Darlene ;-D

Darlene K. Sharar | Construction Management

HDJ DESIGN GROUP, PLLC

Engineers | Landscape Architects | Planners | Surveyors

314 W. 15th Street, Vancouver, WA 98660

Phone: 360/695-3488 Fax: 360/695-8767

ShararD@hdjdg.com

From: Luanne Berkey [mailto:Luanne.Berkey@pgn.com]

Sent: Wednesday, June 10, 2015 7:48 AM

To: Dan Huff (dpw@cityofmolalla.com); stahly@molalla.net

Cc: Sharar, Darlene K.

Subject: Project Packet - Urban Renewal Project - Heintz St. PGE Streetlight #M1594768

Attached you will find a copy of our customer responsibility letter for street lighting, PGE’s approved street lighting equipment list, a PGE drawing of the project and the Streetlight Job Cost Agreement.

Please pass this information on to any contractors who may be doing any portion of this work. A pre-construction meeting is required on site, and all conduit work must be inspected before you backfill. Please call Jim Kacalek @ 503.747.9159 two days prior to backfilling for conduit/trench inspections.

The bottom of the streetlight pole needs to be installed at the same time the conduit system is installed. PGE will provide the bottom of the two piece pole and your contractor may pick them up from our Woodburn storeroom, please call 503.980.2137 prior to pick up to verify material is in (reference M#1594768).

Please return payment along with a signed copy of the attached Streetlight Job Cost Agreement to the address listed at the bottom of the Streetlight Job Cost Agreement.

Please feel free to call me if you have any questions or concerns.

Luanne Berkey | Lighting Specialist

Service & Design

Portland General Electric

4245 Kale St. NE | Salem, Oregon 97305

| (: (503) 463-6161 7: (503) 463-4308 | *: luanne.berkey@pgn.com

image

DISCLAIMER: This electronic message and any attachments are supplied in good faith and are believed to be virus free. HDJ Design Group, PLLC accepts no responsibility for the damage or loss (arising from negligence or otherwise) which may occur through the use or transmission of this message and attachments.

The contents of this electronic message and any attachments are intended only for the addressee and may contain privileged or confidential information. If you are not the addressee, you are notified that any transmission, distribution, downloading, printing or photocopying of the contents of this message or attachments is strictly prohibited. The privilege of confidentiality attached to this message and any attachments is not waived, lost or destroyed by reason of mistaken delivery to you. If you receive this message in error, please notify the sender by return email or telephone by calling (360) 695-3488.