From: Jennifer Cline
Sent: Wed Mar 23 09:04:38 2016
To: Nicolas Lennartz
Subject: FW: MRM Water Main extension
Importance: Normal
Attachments: image003.jpg; RE: New stamped water line plan; fyi Jennifer Cline, P.E. | Public Works Director Licensed in OR, WA 117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038 O: 503.759.0218 | F: 503.829.3676 From: Mitch Jorgensen [mailto:mjj@molalla.net] Sent: Tuesday, March 22, 2016 8:43 PM To: 'Jennifer Cline' <jcline@cityofmolalla.com> Subject: MRM Water Main extension We are gearing up to submit this to you for approval. Need a signed LUCS to take with approved plans to O.H.A. Once I get the final plans we’ll have the MFD sign off too as per Hassan’s recommendation. I forwarded a copy of his comments so you don’t have to go digging for it. I’ll provide costs in 6” and 8” so costs are identifiable. Who needs to sign the LUCS, and do you have a blank boiler plate copy of one? I want to get the plan submitted to move that fire hydrant near our new shop, but I don’t want to include it in this plan unless we have to. Are you going to make us get approval from O.H.A. to move it too? There’s no sewer line crossing, and we don’t anticipate a huge move with it. May alter the position slightly, and place on the other side of the existing water line. Mitch Jorgensen, Pres. Molalla Redi-Mix & Rock Products, Inc. PO Box 555 Molalla, Or 97038 (503) 829-5555 x 15 office (503) 829-5558 fax (503) 969-3377 cell Online at molallaredimix.com From: Jennifer Cline [mailto:jcline@cityofmolalla.com] Sent: Thursday, November 06, 2014 12:25 PM To: Mitch Jorgensen Cc: Dan Huff; Garrett Edmunds; Dan Zinder Subject: RE: MRM Water Main extension Hi Mitch, In order to do that the City will need a cost proposal for both 6” and 8” line sizes prior to construction. The cost difference will be refunded once the waterline install is complete and accepted by the City after inspection. In addition, please insure all of Hassan’s comments have been met, including Garrett’s request for specifying PEX tubing for the service line. See attached email. Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676 From: Mitch Jorgensen [mailto:mjj@molalla.net] Sent: Wednesday, October 15, 2014 5:36 PM To: 'Jennifer Cline' Cc: 'Dan Huff'; 'Garrett Edmunds'; 'Dan Zinder' Subject: RE: MRM Water Main extension Awesome; and not so awesome. This was approved as a 6” line to begin with. How about the City pick up the extra cost to go 8”? From: Jennifer Cline [mailto:jcline@cityofmolalla.com] Sent: Wednesday, October 15, 2014 5:02 PM To: 'Mitch Jorgensen' Cc: Dan Huff; Garrett Edmunds; Dan Zinder Subject: MRM Water Main extension Hi Mitch, Good news, I was able to locate the full easement that was recorded with the county so we are “good to go” with the existing 15’ easement. Please make sure the easements in the attached docs are represented on the plans. I also spoke with Hassan, since the water line will eventually be in full circulation line when the road is annexed, we require the line to be 8” pipe. Regards, Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.829.6855 Ext. #218 F: 503.829.3676 QCT/CCT #44362