From: Jennifer Cline
Sent: Wed Sep 23 16:46:10 2015
To: Andrew Schafer
Cc: Dan Huff
Subject: FW: Mobilitie- Permit Sequences and installation of new pole- Molalla city
Importance: Normal
Attachments: adsfasdf-300x225.jpg; images.jpg; Slider-Small-Cells1-e1357672233793.png; Information Sheet.docx; image001.png; Hi Andrew, I received a phone call and now an email from this Mobilitie group. I wanted to verify if you have heard of them before handing information out. Thanks, Jennifer Cline, P.E. | Public Works Director Licensed in OR, WA 117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038 O: 503.759.0218 | F: 503.829.3676 From: Sareh Salamipour [mailto:sareh.salamipour@mobilitie.com] Sent: Wednesday, September 23, 2015 4:26 PM To: jcline@cityofmolalla.com Subject: Mobilitie- Permit Sequences and installation of new pole- Molalla city Dear Jennifer, Mobilitie is proposing to install small communications equipment on utility poles wholly within the Right-Of-Way of your jurisdiction, Molalla city. Among other things, this initiative will improve the e911 capabilities within your city. We are still in the candidate identification phase of this project, but our goal is to utilize as many existing utility/light poles as possible. In some cases the equipment may require erecting the new utility pole/light pole, however, in the limited scenarios that a new pole is required, it will be designed to match the architectural/ physical features of the existing poles in the area. We are currently in the early stages of development, but I was hoping to receive some information on the process(es) that will be required for proper permitting, such as:
a. For attachment
b. For new pole
c. For replacement
6. How long Permit is valid for?
14. Who owns the city lights?
15. Can Mobilitie attached the equipment to city owned poles?
Also I included sample pictures of small cells to give you an idea how they look like and how they are going to be attached to the utility poles.
Any additional insight you can provide is greatly appreciated. Also, it was my understanding that because we are working in public right of way, we would be working exclusively with the public works department; however, if our scope of work would require permits/approval from additional department please advise.
Once our site locations are finalized and drawings are subsequently produced, I will be sure to send them to you for preliminary review and further direction.
If you have any additional questions/concerns, please feel free to contact me.
Best Regards,
Sareh Salamipour | Network Real Estate Specialist
Sareh.salamipour@mobilitie.com
2955 Redhill Ave Ste. 200 | Costa Mesa | CA 92626
714 215 6755 Mobile |
CONFIDENTIALITY NOTICE | The email message contains confidential and proprietary information, including all attachments (if any) to this email even if such attachments are not separately marked as confidential and/or proprietary. Such information is exclusively for the addressee(s) and no others, unless and to the extent expressly stated above to the contrary. If the recipient of this email is not the addressee, such recipient is prohibited from reading or using this message in any way. If you have received this message by mistake, please call us immediately and destroy the email message and all attachments.