From: Jennifer Cline

Sent: Tue Apr 19 15:48:36 2016

To: Adam Shultz; Dennis Welle

Subject: FW: Mesh

Importance: Normal

Attachments: IMG_2603-med.jpg; IMG_2608-med.jpg;

 

Looks like the HVF was installed.

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Craig Loughridge [mailto:pioneer@bybryson.com]

Sent: Tuesday, April 19, 2016 3:37 PM

To: Jennifer Cline <jcline@cityofmolalla.com>

Cc: Dan Huff <dhuff@cityofmolalla.com>

Subject: Re: Mesh

Jennifer,

Now that I’m back in my office, here are a couple more photos of the re-installed mesh barrier (brand new, and with more posts).

Best Wishes... Craig

Craig Loughridge

Project Manager

Molalla Community Builders/Bear Creek Byway

P.O. Box 105, Molalla, OR 97038

503-349-6892 cell

pioneer@bybryson.com

From: Jennifer Cline

Sent: Monday, April 18, 2016 2:47 PM

To: Craig Loughridge

Cc: Dan Huff ; 'Luanne Berkey'

Subject: Bear Creek By-way Bridge

Hi Craig,

I received a citizen concern in regards to the electrical conduit work to be completed on the project. The question was: Can this work be done by a non-licensed person? I was able to confirm the answer with Luanne Berkey at PGE. The answer is yes; a non-licensed work may install the conduit as long as the conduit is installed per plan and inspected by a PGE inspector prior to backfill.

Second concern, as of last Friday no High Visibility Fencing has been placed around both entrances to the bridge structure. This is my third official request. Please make sure the fencing is placed within 48 hours. If this has been completed, please disregard my request.

Regards,

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

image