From: Jennifer Cline
Sent: Tue Dec 23 08:54:22 2014
To: Lee, Rob
Cc: Garrett Edmunds
Subject: FW: Flow Meters for Molalla
Importance: Normal
Attachments: D351E2E9-7CA4-4BBF-90B9-441F37BFB203[4].png; AAAQ1024-03 Molalla Revised.pdf; 2102_Wireless_Module.pdf; This just came in as well. Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676 From: Mary K Weinstein [mailto:MWeinstein@weci.com] Sent: Tuesday, December 23, 2014 8:53 AM To: Jennifer Cline; Jason Powers Cc: Garrett Edmunds; Lee, Rob Subject: Re: Flow Meters for Molalla Here is the revised quote and cut sheet on the 2102 wireless. I believe I mentioned before that each unit takes 2 batteries which are not included. Teledyne Isco recommends the Energizer 529 6V batteries which are easily purchased locally. With the $25 expedite fee we can ship in 2-3 weeks. Once the order is placed I will get a firm ship date from the factory. Depending on that date we can expedite freight if needed at that time. Thanks, Merry Christmas! Mary Kay Weinstein Whitney Equipment Company Inc 21222 30th Dr SE Suite 110 Bothell, WA 98021 425-486-9499 fax 425-485-7409 From: Jennifer Cline <jcline@cityofmolalla.com> Date: Monday, December 22, 2014 at 4:08 PM To: Jason Powers <jpowers@weci.com> Cc: Mary K Weinstein <mweinstein@weci.com>, Garrett Edmunds <gedmunds@cityofmolalla.com>, "Lee, Rob" <roblee@BrwnCald.com> Subject: Flow Meters for Molalla Hi JP, To follow up with my voicemail today, we recently were able to further define meter locations and our needs. We know we will need 7 Total meters; (6) manual reads and (1) wireless. Regarding the wireless, we are looking for a radio read versus an online monitoring data system. Is that option available? Another question, what is the actual delivery time? I see the quotes states 6 weeks. Is it possible to have these in 2 week? I would rather not push this out to next season. Here are the sizes of the pipes (specifically the highlighted pipe size) of the manholes we have decided to use for monitoring: #1 - 12" PVC into 12" PVC #2 - 12" PVC into 12" PVC, 15" PVC bypass line enters AND 15" PVC Bear Creek bypass line exits #3 - 8" concrete into 8" concrete #4 - 8" concrete into 8" concrete #5 - 10" concrete into 10" concrete #6 - 10" concrete into 10" concrete - Note - where the Heinz and Grange lines meet it becomes 12" #7 - 15" concrete Into 15" concrete - 12" concrete? From east (BC_A) Please call me at your earliest convenience. I will be in the office most of tomorrow and Wednesday morning. Happy Holidays!!! Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676