From: Jennifer Cline

Sent: Mon May 16 14:16:25 2016

To: Marc McKee

Cc: Hash, Kenneth F.; Buehler, John A.; Dennis Welle; Adam Shultz

Subject: FW: Check/Diamond Cutting

Importance: Normal

Attachments: image001.jpg;

 

Approved.

image

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Buehler, John A. [mailto:BuehlerJ@hdjdg.com]

Sent: Monday, May 16, 2016 11:12 AM

To: 'Jennifer Cline' <jcline@cityofmolalla.com>; Hash, Kenneth F. <HashK@hdjdg.com>

Subject: RE: Check/Diamond Cutting

Good afternoon Jenn,

Sorry I was in a meeting. The spacer brick (Dobie Block) looks to be a 4000psi block. I see no concerns with this block being used for as a riser/spacer on the manholes between this and the ODOT specifications.

John Buehler, EIT | Staff Engineer II | 360.567.2107 (direct)

HDJ – A Division of PBS

This electronic communication and its attachments are intended only for the person(s) to whom it is addressed and may contain confidential information. If you are not the intended recipient of this message, you are hereby notified that any use, retransmission, distribution, reproduction or any action relying upon this message is prohibited. If you have received this information in error, please notify the sender.

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Friday, May 13, 2016 2:10 PM

To: Buehler, John A. <BuehlerJ@hdjdg.com>; Hash, Kenneth F. <HashK@hdjdg.com>

Subject: Fwd: Check/Diamond Cutting

Any concerns with this submittal?

 

Sent from my iPhone

 

Begin forwarded message:

From: "Marc McKee" <Marc@kodiakco.com>

Date: May 13, 2016 at 1:38:50 PM PDT

To: "'Jennifer Cline'" <jcline@cityofmolalla.com>

Cc: "'Adam Shultz'" <ashultz@cityofmolalla.com>, "'Hash, Kenneth F.'" <HashK@hdjdg.com>, "'Dennis Welle'" <dwelle@cityofmolalla.com>, "'Buehler, John A.'" <BuehlerJ@hdjdg.com>

Subject: RE: Check/Diamond Cutting

Sorry you’re correct that was left out. Here is the product info on them. Sorry this is being informally submitted too. I am checking to see if any of the suppliers have an actual product data sheet.

image

Thank you,

Marc McKee

Kodiak Pacific Construction

C(503) 880-2035 O(503) 783-4305

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Friday, May 13, 2016 1:30 PM

To: Marc McKee

Cc: Adam Shultz; Hash, Kenneth F.; Dennis Welle; Buehler, John A.

Subject: Re: Check/Diamond Cutting

Hi Marc

The Speed Crete Red Line grout submittal is approved.

Unless I missed an email I didn't see a Dobie submittal.

Thanks

Jenn

 

Sent from my iPhone

 

On May 13, 2016, at 12:59 PM, Marc McKee <Marc@kodiakco.com> wrote:

Jennifer -

Just to follow up with this in writing, we will do our manhole adjustments on the 17th and patch them back on the 18th. The street will be left closed from the 17th to the 18th and we will cone any manholes that are left open outside of our closure. I don’t think there are any though.

Can we get at minimum a verbal approval that our grout and Dobie submittal are approved?

Thank you,

Marc McKee

Kodiak Pacific Construction

C(503) 880-2035 O(503) 783-4305

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Thursday, May 12, 2016 5:09 PM

To: Marc McKee

Cc: Peggy Johnson; Adam Shultz; Hash, Kenneth F.; Dennis Welle; Buehler, John A.

Subject: RE: Check/Diamond Cutting

Hi Marc,

The 30 minutes is just the set time. What we are looking to achieve is the 24-hour compressive strength.

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Marc McKee [mailto:Marc@kodiakco.com]

Sent: Thursday, May 12, 2016 10:05 AM

To: 'Jennifer Cline' <jcline@cityofmolalla.com>

Cc: 'Peggy Johnson' <pjohnson@cityofmolalla.com>; 'Adam Shultz' <ashultz@cityofmolalla.com>; 'Hash, Kenneth F.' <HashK@hdjdg.com>; 'Dennis Welle' <dwelle@cityofmolalla.com>; 'Buehler, John A.' <BuehlerJ@hdjdg.com>

Subject: RE: Check/Diamond Cutting

Grout Submittal Attached. This product actually has a 30 minute cure time. This would allow us to reset all manholes on the 18th and then patch back that same day. Can this be approved? Sorry I was not aware of such a product when I sent my previous email requesting 17th construction/18th pave back on these…

I asked our General Construction superintendent and he indicated that they would be using just the grout and concrete dobie blocks for elevation changes. We don’t know what the metal spacers are. Hopefully Dobie blocks will work for you guys?

Thank you,

Marc McKee

Kodiak Pacific Construction

C(503) 880-2035 O(503) 783-4305

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Thursday, May 12, 2016 9:29 AM

To: Marc McKee

Cc: Peggy Johnson; Adam Shultz; Hash, Kenneth F.; Dennis Welle; Buehler, John A.

Subject: RE: Check/Diamond Cutting

Hi Marc,

Thank you for the update. I will have Adam set the meter once we receive the check.

In regards to the diamond cut, since this project was built from ODOT standards, I will defer to their standards. Please see ODOT standard drawing, Manhole Frame Adjustment RD360 Method “C”, with the exception of #4 bars and PCC. The #4 bars and PCC may be eliminated and PCC replaced with AC.

Please Note: Install metal spacers with non-shrink grout and allow minimum 24 hour cure. Please provide submittal for the spacers and non-shrink grout.

Thanks,

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Marc McKee [mailto:Marc@kodiakco.com]

Sent: Wednesday, May 11, 2016 5:20 PM

To: 'Jennifer Cline' <jcline@cityofmolalla.com>

Subject: Check/Diamond Cutting

The check for the meter will be mailed tomorrow.

Is there a specific size or parameter we are cut for the diamond cutting around the manholes?

Thank you,

Marc McKee

Kodiak Pacific Construction

C(503) 880-2035 O(503) 783-4305