From: Jennifer Cline

Sent: Mon Dec 22 16:12:17 2014

To: 'Jason Powers'

Cc: 'Mary K Weinstein'; Garrett Edmunds; Lee, Rob

Subject: Flow Meters for Molalla

Importance: Normal

 

Hi JP,

To follow up with my voicemail today, we recently were able to further define meter locations and our needs. We know we will need 7 Total meters; (6) manual reads and (1) wireless. Regarding the wireless, we are looking for a radio read versus an online monitoring data system. Is that option available?

Another question, what is the actual delivery time? I see the quotes states 6 weeks. Is it possible to have these in 2 week? I would rather not push this out to next season.

Here are the sizes of the pipes (specifically the highlighted pipe size) of the manholes we have decided to use for monitoring:

#1 - 12" PVC into 12" PVC

#2 - 12" PVC into 12" PVC, 15" PVC bypass line enters AND 15" PVC Bear Creek bypass line exits

#3 - 8" concrete into 8" concrete

#4 - 8" concrete into 8" concrete

#5 - 10" concrete into 10" concrete

#6 - 10" concrete into 10" concrete -

Note - where the Heinz and Grange lines meet it becomes 12"

#7 - 15" concrete Into 15" concrete - 12" concrete? From east (BC_A)

Please call me at your earliest convenience. I will be in the office most of tomorrow and Wednesday morning.

Happy Holidays!!!

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C: