From: Jennifer Cline

Sent: Wed Jan 20 17:53:20 2016

To: 'Gerald Fisher'

Cc: Nicolas Lennartz; Dan Huff

Subject: Bear Creek Subdivision - Traffic Study

Importance: Normal

Attachments: Hezzie Lane LOS Rpt 1-15-16.pdf;

 

Hi Gerald,

Attached is the traffic study for the Bear Creek Subdivision. If you have any comments, Nicolas would like to have them by Feb. 2nd.

Some comments I currently have:

· What are the model assumptions?

· What phase is the 2018 traffic counts representing?

· Does the model consider the Ona Way connection is functioning for either 2018? 2035?

· Is Hezzie connected through to Toliver for 2035?

· Typically maps are provided for each report, detailing movements with LOS and v/c ratios.

· I see several LOS of D-F for 2035 AM and PM peak flows

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676