Hi Ken,
Just to confirm the plan, we are still planning to add a 6” valve and stub a line to Avison’s property per Plan Sheet 25 and cap the existing line?
The plan sheet says reconnect, however I do not want to reconnect as we discussed. Although, I would like to keep the street from being excavated in the future with development on that property. I believe a valve and 6” line stub should still be included. If we need an extra 6” valve, the City has an extra one available.
I don’t think I was being clear on what to do there.