From: Jennifer Cline

Sent: Thu Apr 16 14:58:38 2015

To: Hassan Ibrahim

Cc: 'Curtis Cooksey'; Dan Huff; Heather Penni; Dennis Welle; 'Adam Shultz'

Subject: Additional C.O requests

Importance: Normal

 

Hi Hassan,

The City would like to request a change order for the 3 additional items.

· Storm drain pipe repair from the catch basin located at the NE corner of 6th St and Stowers Ave.

· Construct a new storm Type G-2 Basin at the NW corner of 7th and Stowers and connecting it to the storm main in 7th St. There is nowhere for the water flowing to the south to drain. The next nearest storm basin is on 7th and Cole at least 100 yards away with almost 0% slope in some areas.

· Add a water valve at Heintz and Kennel for the south main on Kennel. There currently is no ability to shut off the water south on Kennel without turning off other users water as well. 1 existing valve is to be abandoned as well.

· Add 1 day to the schedule for determining the driveway conflicts on Stowers.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218