Gerald,

Can we go ahead and postpone the monthly meeting for this month? Just an update on a few things at the Plant – Contractor is painting some piping and making repairs in the chlorine room. Chlorine tanks for the Sodium Hypochlorite looks like they have arrived. The contractor tied in the influent piping and installed the new backwash pump. The filter media is onsite however the installation will most likely be next week because the contractor is waiting on a piece of pipe for the backwash piping on filter #2 (media cannot be installed until we can run backwash water through the new plant). We may have a meeting Thursday to go over installation of the new fiber cable to the pump station and talk about scheduled shutdowns. And finally , contractor is waiting on the effluent pump before the can finish the installation of the backwash piping.

Ryan Hepler | Water Treatment Operator

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.5408 I Fax: 503.829.3676

rhepler@cityofmolalla.com

image

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.