From: Gerald Fisher
Sent: Mon Dec 28 11:58:49 2020
To: Andy Peters
Subject: RE: WO#12421 Promise Date Change
Importance: Normal
Attachments: image001.png; Sounds good. Regards, Gerald Fisher, P.E. | Public Works Director City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.829.6855 | Direct: 503.759.0218 CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you. From: MolallaOps@CityOfMolalla.com <MolallaOps@CityOfMolalla.com> Sent: Monday, December 28, 2020 11:24 AM To: Andy Peters <apeters@cityofmolalla.com>; Gerald Fisher <gfisher@cityofmolalla.com> Subject: WO#12421 Promise Date Change Promise Date Change to WO#12421. GERALDS INSTRUCTIONS: Install 25 MPH Speed signs off of Cole Avenue at Garden Court, Patrol Street, Heintz Street (east leg), and Shirley Street (east leg). Sign type is R2-1, 24x30. Place signs within 100 feet of intersection. If removal of dead end sign and colocation with speed sign is a preferred option then install new post with both signs. Contact Gerald if there are any issues or a field locate is needed. CLARIFYING NOTES FROM ANDY: on Patrol St, replace that Galvanized post with Telespar. E Heintz – Install telspar between sidewalk and fence and post dead end and 25 MPH signs. We don’t want to mount on light poles if at all possible. Issues with PGE. BILL OF MATERIALS -4x R2-1 25mph speed signs -2x small Dead End sign: -4x 12" Telespar poles and anchors and sleeves, for mounting in soil. update: 12-28-20 sent email to TSSCO for order JJ The promised date changed from 12/31/2020 12:00:00 AM to 1/7/2021 12:00:00 AM the reason given was: [Parts ordered 12/28/20. Should be able to jump on this first week in January. Jamie/Andy].
You are receiving this message because your email address was entered into the work order and the option 'notify on promise date changes' was selected. If you feel you've received this email in error please contact Molalla Operations or City Hall: (503) 829-6855.