From: Gerald Fisher
Sent: Wed Aug 12 12:33:23 2020
To: Andy Peters; Sam Miller
Subject: RE: Industrial way section
Importance: Normal
Attachments: Industrial Way Street Section.png; image001.jpg; Andy and Sam, Attached was the design section back in 1993. 3” of Class B HMAC over 2” of 1”-0 over 16” of 1.5”-0 and possible geotextile fabric if recommended by the engineer. Clearly 1.75” of HMAC on garbage was not within specifications. Not surprised. Regards, Gerald Fisher, P.E. | Public Works Director City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.829.6855 | Direct: 503.759.0218 CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you. From: Andy Peters <apeters@cityofmolalla.com> Sent: Monday, August 10, 2020 10:22 AM To: Gerald Fisher <gfisher@cityofmolalla.com>; Sam Miller <smiller@cityofmolalla.com> Subject: Industrial way section For anyone who wonders why the roads are falling apart we're digging out at Industrial way right now no Base Rock one and three quarter inch of asphalt. Andy