From: Gerald Fisher

Sent: Wed Feb 20 16:28:08 2019

To: Andy McBride

Cc: Michelle M; Seth P; Dan Huff

Subject: RE: Right of way permit

Importance: Normal

Attachments: image002.png; image007.png; image001.jpg; image003.gif; image004.png; image006.png;

 

Andy,

I just received the County’s structural review for the bracing and they said it does not meet the shoring requirements. We need you to install the internal braces immediately and remove them from the street. The braces as they stand are a safety hazard to the public and were installed without review or permits. Do what you have to do to get the braces off of the right of way. We will discuss repair of the curbs that were drilled into once the braces are removed. Thanks.

Regards,

Gerald Fisher, P.E. | Public Works Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.6855 | Direct: 503.759.0218

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: Andy McBride <AndyM@cascadenwconstruction.com>

Sent: Wednesday, February 20, 2019 3:41 PM

To: Gerald Fisher <gfisher@cityofmolalla.com>

Cc: Michelle M <Michellem@cascadenwconstruction.com>; Seth P <Sethp@cascadenwconstruction.com>

Subject: RE: Right of way permit

Hi Gerald-

I am waiting on the shoring design document from our EOR, Eric Watson, Miller Consulting Engineers. We must shore from the outside temporarily until we are able to remove the interior debris, then with Eric’s shore plan we can properly shore from the interior, a little more pull vs push but that is why we are waiting on the engineer. I expect more info next week.

image Andy McBride

Principal

Cascade NW Construction www.cascadenwconstruction.com

801 E. Main St. Molalla, OR 97038 | O: 503.919.2201 | C: 503-332-0038

OR CCB #201730 | WA #CASCANC821BR | OEC 408 COMMUNICATION

image

From: Seth P <Sethp@cascadenwconstruction.com>

Sent: Friday, February 15, 2019 3:14 PM

To: Gerald Fisher <gfisher@cityofmolalla.com>

Cc: Michelle M <Michellem@cascadenwconstruction.com>; Andy McBride <AndyM@cascadenwconstruction.com>

Subject: RE: Right of way permit

Thank you Sir I appreciate it.

image Seth Pownall

Project Manager

Cascade NW Construction sethp@cascadenwconstruction.com

801 E. Main St. Molalla, OR 97038 | O: 503.919.2201 | C: 971.272.4925

OR CCB #201730 | WA #CASCANC821BR | OEC 408 COMMUNICATION

image

From: Gerald Fisher <gfisher@cityofmolalla.com>

Sent: Friday, February 15, 2019 2:02 PM

To: Seth P <Sethp@cascadenwconstruction.com>

Cc: Michelle M <Michellem@cascadenwconstruction.com>; Andy McBride <AndyM@cascadenwconstruction.com>

Subject: RE: Right of way permit

Hi Seth,

Have made contact with our Building Official and they are going to try and review today or by Tuesday if possible. Will get back to you.

Regards,

Gerald Fisher, P.E. | Public Works Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.6855 | Direct: 503.759.0218

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: Seth P <Sethp@cascadenwconstruction.com>

Sent: Friday, February 15, 2019 1:30 PM

To: Gerald Fisher <gfisher@cityofmolalla.com>

Cc: Michelle M <Michellem@cascadenwconstruction.com>; Andy McBride <AndyM@cascadenwconstruction.com>

Subject: RE: Right of way permit

We actually used 5/8” by 6” anchors so I made the correction.

image Seth Pownall

Project Manager

Cascade NW Construction sethp@cascadenwconstruction.com

801 E. Main St. Molalla, OR 97038 | O: 503.919.2201 | C: 971.272.4925

OR CCB #201730 | WA #CASCANC821BR | OEC 408 COMMUNICATION

image

From: Seth P

Sent: Friday, February 15, 2019 1:28 PM

To: 'gfisher@cityofmolalla.com' <gfisher@cityofmolalla.com>

Cc: Michelle M <Michellem@cascadenwconstruction.com>; Andy McBride <AndyM@cascadenwconstruction.com>

Subject: Right of way permit

Hello Gerald-

Is this what you are looking for? If you think you need more or specific information let me know.

Thank you,

image Seth Pownall

Project Manager

Cascade NW Construction sethp@cascadenwconstruction.com

801 E. Main St. Molalla, OR 97038 | O: 503.919.2201 | C: 971.272.4925

OR CCB #201730 | WA #CASCANC821BR | OEC 408 COMMUNICATION

image