From: MolallaOps@CityOfMolalla.com

Sent: Fri Jun 29 14:41:13 2018

To: Andy Peters; Gerald Fisher

Subject: WO#2542 Promise Date Change

Importance: Normal

 

 

***********************************************************************************************

Promise Date Change to WO#2542.

***********************************************************************************************

From Gerald: Andy,

 

I need two signs installed behind the sidewalk ramps on both sides of Heintz Ave at the west side top of wing at the RR right of way. The RR right of way is a multi-use path and the property owner on the north side is driving across our ADA ramp to access the site. Brenda is going to tell him to stop and we will grant him another access point when he goes thru the planning process. If he ignores us then we will need to install concrete blocks while bollards go up. See image below. Thanks. signs need to say “No Motor Vehicles”. Regulatory type R5-3.

 

From Andy: Parts on order PO 1488. I do have an image in an email but we might want to talk with Gerald before we go out. Looks like people are DRIVING over the ADA ramp at the new crosswalk.

 

note: Gerald gets email notifications of promise date change on this work order.

The promised date changed from 6/29/2018 12:00:00 AM to 7/6/2018 12:00:00 AM the reason given was: [signs were ordered today .need to pick them up Monday at traffic safety supply].

 

***********************************************************************************************

 

You are receiving this message because your email address was entered into the work order and the option 'notify on

promise date changes' was selected. If you feel you've received this email in error please contact Molalla Operations or City Hall:

(503) 829-6855.