From: Gerald Fisher

Sent: Tue Sep 08 12:56:01 2020

To: Sam Miller; RaeLynn Erhardt

Cc: tanelson59@gmail.com; Chris Makuch

Subject: RE: mix design for asphalt

Importance: Normal

Attachments: image001.png;

 

RaeLynn,

 

Sam is out and my family was evacuated. All Public works staff are busy so no inspections will be happening for the next couple of days. Will reassess daily. Thx.

 

Gerald Fisher, PW Director

 

Sent from my Verizon, Samsung Galaxy smartphone

 

 

 

-------- Original message --------

From: Sam Miller <smiller@cityofmolalla.com>

Date: 9/4/20 8:54 AM (GMT-08:00)

To: RaeLynn Erhardt <RaeLynn@3mountainsplumbing.com>, Gerald Fisher <gfisher@cityofmolalla.com>

Cc: tanelson59@gmail.com, Install <install@3mountainsplumbing.com>, Chris Makuch <Chris@3mountainsplumbing.com>

Subject: RE: mix design for asphalt

 

Thanks for the update ReaLynn,

I will pass this information along to Gerald Fisher, Who will be conducting the inspections and I have also included in the email.

Regards,

Sam Miller | Sr. Engineer Tech.

City of Molalla

117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038

T : 503-759-0217 | E: smiller@cityofmolalla.com

From: RaeLynn Erhardt <RaeLynn@3mountainsplumbing.com>

Sent: Thursday, September 3, 2020 5:28 PM

To: Sam Miller <smiller@cityofmolalla.com>

Cc: tanelson59@gmail.com; Install <install@3mountainsplumbing.com>; Chris Makuch <Chris@3mountainsplumbing.com>

Subject: RE: mix design for asphalt

Sam,

Thank you so very much we are a go for work on Tuesday 9.8.20!

This is my formal request for inspections on Tuesday, here is my time line and my excavator who will be the one leading the job to keep him updated.

Chris 971-276-0497

We will be starting work first thing in the morning

I would guess an initial connections inspection could be ready around 11am- please talk to excavator onsite

Compaction test is scheduled for 12pm which I know you will want to see

Asphalt pour is scheduled for around 1pm pending your inspection and compact

The final sidewalk is on hold until I get you the concrete mix and then we can do the initial concrete form inspection.

Thank you.

RaeLynn Erhardt

503-670-1342 Office

503-455-8838 Installation & Excavation Direct Line

www.3mountainsplumbing.com

image

Oregon 503.670.1342

OR CCB# 169499 Con ID#3MOUNMP857B3

From: Sam Miller <smiller@cityofmolalla.com>

Sent: Thursday, September 3, 2020 4:40 PM

To: RaeLynn Erhardt <RaeLynn@3mountainsplumbing.com>

Cc: tanelson59@gmail.com; Install <install@3mountainsplumbing.com>

Subject: RE: mix design for asphalt

Hello RaeLynn,

As to our conversation over the phone, 3 Mountain Plumbing is good to go, except pouring of the sidewalk, until I receive concrete mix design. Thanks

Regards,

Sam Miller | Sr. Engineer Tech.

City of Molalla

117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038

T : 503-759-0217 | E: smiller@cityofmolalla.com

From: RaeLynn Erhardt <RaeLynn@3mountainsplumbing.com>

Sent: Thursday, September 3, 2020 3:34 PM

To: Sam Miller <smiller@cityofmolalla.com>

Cc: tanelson59@gmail.com; Install <install@3mountainsplumbing.com>

Subject: FW: mix design for asphalt

Sam,

I have attached the asphalt mix design for you. I also have the compaction test tent. Scheduled for 12pm on Tuesday and Asphalt for 1pm on Tuesday.

After talking to my concrete contractor (T Nelson Concrete) cc’d on this email; he is concerned he may not get the concrete mix design email until Tuesday, that company is out for the Holiday. I don’t want that to delay our state date. Would you ever make an exception and be able to wait for the concrete mix. We were never going to pour the concrete Tuesday anyways. The asphalt and street work were my biggest concern and with needed a pre-pour sidewalk form inspections we can’t do the concrete pour right away?

Please let me know. thank you for reviewing my request.

RaeLynn Erhardt

503-670-1342 Office

503-455-8838 Installation & Excavation Direct Line

www.3mountainsplumbing.com

image

Oregon 503.670.1342

OR CCB# 169499 Con ID#3MOUNMP857B3

From: Bill Rider <Bill.Rider@lakesideindustries.com>

Sent: Thursday, September 3, 2020 3:30 PM

To: RaeLynn Erhardt <RaeLynn@3mountainsplumbing.com>

Subject: mix design

Attached is the mix design you requested

From: RaeLynn Erhardt <RaeLynn@3mountainsplumbing.com>

Sent: Thursday, September 3, 2020 3:28 PM

To: Bill Rider <Bill.Rider@lakesideindustries.com>

Subject: test

RaeLynn Erhardt 503-670-1342 Office 503-455-8838 Installation & Excavation Direct Line www.3mountainsplumbing.com Oregon 503.670.1342 OR CCB# 169499 &n

Caution! EXTERNAL SENDER Do not click links or open attachments unless you KNOW that the sender and content are safe.

sophospsmartbannerend

RaeLynn Erhardt

503-670-1342 Office

503-455-8838 Installation & Excavation Direct Line

www.3mountainsplumbing.com

image

Oregon 503.670.1342

OR CCB# 169499 Con ID#3MOUNMP857B3