From: Gerald Fisher
Sent: Fri Jun 14 08:44:00 2019
To: Grady Johnson
Subject: RE: 529 Hart St.
Importance: Normal
Our records show 4” steel and main is on west side. Street restoration will be t cut and 4” of AC or match existing whichever is greater. It will likely be 4”. Will be out on vacation starting Monday afternoon and will be out until July 5th. Thanks Grady.
Regards,
Gerald Fisher, P.E. | Public Works Director
City of Molalla
117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038
Office: 503.829.6855 | Direct: 503.759.0218
CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.
From: Grady Johnson <grady@gtexcavating.com>
Sent: Friday, June 14, 2019 6:02 AM
To: Gerald Fisher <gfisher@cityofmolalla.com>
Subject: 529 Hart St.
Gerald,
I believe the water main is 4'' steel pipe and it is located on the west side of Hart. Can you confirm/correct me ? Also, if the main is on the west side, what will be required for street restoration, if project is open trenched?
I am assuming that we are putting in a 1'' service for a 5/8 x 3/4 meter.
Grady Johnson
GT EXCAVATING LLC
10333 Wiseacre ln NE
Aurora, OR. 97002
503-310-5442
503-678-3232 office
503-678-7832 fax