From: HAFLEY Dan

Sent: Thu Apr 06 12:14:56 2017

To: 'Susan Hansen'

Cc: JOHNSON Keith; DECONCINI Nina

Subject: RE: Floragon / Bear Creek NFA

Importance: Normal

Attachments: Floragon Figure.PNG;

 

Susan –

I have included a figure showing the relative position of the SE Corner and Dip Tank parcels, located in the southeastern-most portion of the 100+-acre site. Within the SE Corner parcel is the small area (1-acre pavement control area) where DEQ determined protective measures were necessary and augmenting of the existing cap (paving) occurred. For the Dip Tank area, a range of cleanup options will be considered including full soil removal, partial soil removal (most highly-contaminated around the former dip tank locations), and capping. Work will necessarily include cleanout of the existing stormwater drainage system. The forthcoming Feasibility Study for the Dip Tank area will compare and contrast cleanup options as specified in State of Oregon rule, which includes consideration of cleanup effectiveness, implementability, and cost.

The “excluded” text associated with the Dip Tank area merely means that it is considered separate from the SE Corner parcel. Bear Creek is also not considered part of the SE Corner; a separate remedy selection process will occur for this area.

I hope you find this information helpful.

Respectfully,

Dan Hafley

From: Susan Hansen [mailto:foxglovefarm@inbox.com]

Sent: Wednesday, April 05, 2017 11:39 AM

To: HAFLEY Dan

Cc: JOHNSON Keith; DECONCINI Nina

Subject: RE: Floragon / Bear Creek NFA

Thanks Dan. I am assuming when you say "dip tank area" you are talking about that dip tank between the old buildings and Molalla Ave - the one we objected to being simply capped? What is the proposal for that work you refer to about the dip tanks? Please do dig and keep us informed about this proposed expansion. I didn't think there was much left to expand to except for these parts that are on hold till mitigation is complete. Susan

-----Original Message-----

From: dan.hafley@state.or.us

Sent: Wed, 5 Apr 2017 17:50:53 +0000

To: foxglovefarm@inbox.com

Subject: RE: Floragon / Bear Creek NFA

Susan –

Thank you for the Molalla Pioneer news article, and sorry for the delayed response. I was out ill most of yesterday and wanted to take time to provide a thoughtful response to your question. We would not expect proposed expansion of the PAC Fiber “Enterprise Zone” to extend into any portions of the Floragon site where cleanup work has not been completed, including Bear Creek, the Dip Tank Area, or the 16-acre SE corner. We will do a little digging and confirm the extent of potential expansion and get back to you ASAP.

Regarding the status of Floragon site work, our current plan is to selected and implement a remedy for the Dip Tank area in 2017, likely late summer. This work has to be done prior to Bear Creek to ensure that there is no potential for recontamination of the creek, given that the Dip Tank Area is the source of both runoff and stormwater discharge to the creek. We expect Bear Creek work to occur in 2018, and will of course keep you appraised of developments, including any planning related to Bear Creek restoration work.

Respectfully,

Dan Hafley

From: Susan Hansen [mailto:foxglovefarm@inbox.com]

Sent: Tuesday, April 04, 2017 9:32 AM

To: HAFLEY Dan; HAFLEY Dan

Cc: DECONCINI Nina

Subject: Floragon / Bear Creek NFA

Hi Dan,

 

Last we heard, there was still no approved mitigation plan for the Bear Creek area of Floragon. I just read that Pacific Fiber which is located on the northern part of Floragon is planning to expand to the "south" on Floragon. I assume that "south" is not the part of Floragon that you said DEQ would not approve for NFA until mitigation was approved and done? Please let us know where this stands. We requested a hearing when mitigation is proposed that DEQ accepts.

 

Sincerely,

Susan Hansen

Bear Creek Recovery