From: Susan Hansen

Sent: Mon Nov 27 18:07:05 2017

To: YELTON-BRAM Tiffany

Cc: DECONCINI Nina

Subject: RE: Documents related to warning letter to Molalla re: Stoneplace phase 3?b Importance: Normal

Attachments: big-meadow-2.jpg;

 

Dear DEQ,

 

To follow up on our complaint about how many projects may have been built that should have been subject to DEQ approval, here is a photo from Molalla Planning website of the large parcel that was re-zoned from multi-family to single family and then built out in the past two years by Stafford homes. Was this or was this not subject to DEQ sewer connection approval? It certainly was larger than an acre - it is in the NE corner of Big Meadow subdivision. See attached photo of the site. It was bare land - no roads, nothing but an empty field - until construction began in 2015. Was DEQ privy to this project?

 

Here is a newspaper story about the Big Meadow project and a video of the construction - on over 13 acres, dated June, 2015:

 

"Big Meadow is in the 15th phase of the project, the latest which consists of two parcels of land that total 13.06 acres. When all the dust settles there will be 53 detached single-family homes on the land, which sits on the far back side of the development, connected to Julie Lane, right on the northern edge of the Molalla city limits."

http://portlandtribune.com/cby/147-news/264551-137919-stafford-land-co-makes-huge-bet-on-the-local-area

Here is video of the bulldozers starting to clear land and build roads on that project:

 

https://www.youtube.com/watch?v=JRl1B-5ip-g

 

 

Susan Hansen

Bear Creek Recovery

 

 

 

-----Original Message-----

From: tiffany.yelton-bram@state.or.us

Sent: Tue, 28 Nov 2017 01:42:39 +0000

To: foxglovefarm@inbox.com

Subject: RE: Documents related to warning letter to Molalla re: Stoneplace phase 3?

 

Susan

This request did not get properly entered in the PRR system (our mistake) so I am going to reply to your email here in response and attach the relevant emails and letters.

A note about what we review and coordination with construction stormwater construction permit applications: The review of applications for coverage under our construction stormwater permit applies to projects of a certain size and the review of the application materials is done by an engineer with experience and training in stormwater controls. The review of plans and specifications of additions to the sewage collection system is required when a new main or pump is added not simply when a lateral owned by the property owner is connected to the city’s main. The review is done by an engineer familiar with the NPDES permit for the treatment plan that the collection system will connect to. Coordination between these reviews is not typically done because of the projects that come in for stormwater permit coverage may not also come in for sewage collection plan and specification review and vice versa because the project may not meet the criteria for review under both our Engineering plan review rules and the requirements for stormwater permit coverage. It is also true that a project might come in for stormwater permit coverage long before the final design for the sewer collection system is prepared.

Tiffany Yelton Bram

WQ Source Control Manager

Oregon Department of Environmental Quality

700 NE Multnomah St., Suite #600

Portland OR 97232

Desk 503 229 5219

Mobile 503 975 0046

DEQ has a new website! Please update your bookmarks and check out the new site here: http://www.oregon.gov/deq/pages/index.aspx

From: Susan Hansen [mailto:foxglovefarm@inbox.com]

Sent: Monday, October 30, 2017 3:45 PM

To: YELTON-BRAM Tiffany <tiffany.yelton-bram@state.or.us>; DECONCINI Nina <nina.deconcini@state.or.us>

Subject: Documents related to warning letter to Molalla re: Stoneplace phase 3?

The warning letter to City of Molalla/ Dan Huff regarding Stoneplace phase 3 constructed without DEQ input referenced conditions and asked for a city response. Seeking all documents exchanged because of the warning letter (I received a copy as requested of the warning letter but DEQ failed to provide the referenced documents with conditions).

Here's the submitted request: Attn: Tiffany Yelton-Bram - Requesting all documents generated or received after the warning letter to City of Molalla / Dan Huff was issued regarding the construction of Stoneplace phase 3 without DEQ input. Seeking the document outlining conditions and any other documents to Molalla or from the City of Molalla regarding the warning and the conditions. Bear Creek Recovery seeks a fee waiver if any charge is associated with said request - fee waiver document is on file.

Susan Hansen

Bear Creek Recovery.

-----Original Message-----

From: foxglovefarm@inbox.com

Sent: 30 Oct 2017 15:40:44 -0700

To: foxglovefarm@inbox.com

Subject: Input Received:

 

Submitted: 10/30/2017 3:40:25 PM

 

Requester Information

Please provide us with contact information for your request.

 

Name

 

Susan Hansen

 

Company

 

Bear Creek Recovery non-profit

 

Address

 

PO Box 50 , Molalla 97038 United States

 

Phone

 

(503) 789-7179

 

Email

 

foxglovefarm@inbox.com

 

Request Information

Tell us about the information you are requesting.

 

How would you like to receive your request?

 

Electronic Copies

 

Departmental Routing

 

Select...

 

If this is regarding an enforcement action, you are required to provide a case name and number.

 

 

This request is made on behalf of:

 

 

Program (if known)

 

 

Site Address and Location Information: An address is required for information on specific sites. For onsite/septic requests, you must provide a township, range and section.

 

 

Multiple addresses for site?

 

 

Site Type

 

Select...

 

Site County

 

Select...

 

Township

 

 

Range

 

 

Section

 

 

Tax Account/Lot #

 

 

Subdivision

 

Records Requested

 

 

Attn: Tiffany Yelton-Bram - Requesting all documents generated or received after the warning letter to City of Molalla / Dan Huff was issued regarding the construction of Stoneplace phase 3 without DEQ input. Seeking the document outlining conditions and any other documents to Molalla or from the City of Molalla regarding the warning and the conditions. Bear Creek Recovery seeks a fee waiver if any charge is associated with said request - fee waiver document is on file.