Attachments: P1240612 Aug 1 evening - volume of water dischared in Creamery Creek field.jpg; P1240621 broken pile fitting spewing water to Freyer Pk road ditch foreground Aug 1.jpg; P1240772e Aug 3 sprinkling along Creamery Creek causing runoff into Creamery Creek and to channel flowing south to Mathias Rd.jpg; P1240779e Creamery Creek flowing via runoff from sprinklers.jpg; P1240833 Aug 3 red line Creamery Creek purple line downhill runoff from sprinklers to Freyer Pk Rd channel dry before and after sprinkling.jpg; P1240837 Aug 4 Creamery Creek dimished sprinklers stopped.jpg; P1240893 Aug 4 runoff to south to Freyer Park Rd diminished with sprinklers stopped in Creamery Creek field.jpg; P1250112ec Creamery Creek Mathias August 8 no sprinklers.jpg; P1250533 Aug 10 Creamery Creek at Mathias dry no sprinkling.jpg; P1270228 Aug 18 Creamery Creek Mathias dry August 18 2014.jpg;

 

Dear DEQ,

 

Find attached more photos showing the ebb and flow of recycled water runoff in the Creamery Creek field in early to mid-August. Note how quickly the runoff disappears when the sprinklers are stopped. Note the great volume of water applied for days in one small wetlands field that has Dayton hydric soil. Please note this was pointed out in my written testimony. Putting these photos together with the Aug 25 event photos should give you a clear picture that the only reason these channels of water ran this summer was due to runoff from over use of recycled water. By the way, the sprinklers have been off in that field since the late August ponding and Creamery Creek and the other channel to the south in the field are both bone dry (I document that almost every day).

 

Sincerely,

Susan Hansen

Bear Creek Recovery

 

-----Original Message-----

From: foxglovefarm@molalla.net

Sent: Fri, 12 Sep 2014 11:09:22 -0700

To: foxglovefarm@inbox.com

Subject: Emailing: P1240612 Aug 1 evening - volume of water dischared in Creamery Creek field, P1240621 broken pile fitting spewing water to Freyer Pk road ditch foreground Aug 1, P1240772e Aug 3 sprinkling along Creamery Creek causing runoff into Creamery Creek a

 

Your message is ready to be sent with the following file or link

attachments:

P1240612 Aug 1 evening - volume of water dischared in Creamery Creek field

P1240621 broken pile fitting spewing water to Freyer Pk road ditch

foreground Aug 1

P1240772e Aug 3 sprinkling along Creamery Creek causing runoff into

Creamery Creek and to channel flowing south to Mathias Rd

P1240779e Creamery Creek flowing via runoff from sprinklers

P1240833 Aug 3 red line Creamery Creek purple line downhill runoff from

sprinklers to Freyer Pk Rd channel dry before and after sprinkling

P1240837 Aug 4 Creamery Creek dimished sprinklers stopped

P1240893 Aug 4 runoff to south to Freyer Park Rd diminished with

sprinklers stopped in Creamery Creek field

P1250112ec Creamery Creek Mathias August 8 no sprinklers

P1250533 Aug 10 Creamery Creek at Mathias dry no sprinkling

P1270228 Aug 18 Creamery Creek Mathias dry August 18 2014

 

Note: To protect against computer viruses, e-mail programs may prevent

sending or receiving certain types of file attachments. Check your

e-mail security settings to determine how attachments are handled.