From: Gerald Fisher

Sent: Wed Jan 22 15:17:11 2020

To: Leota Childress

Subject: RE: Chapter 13.08 Sanitary Sewers

Importance: Normal

 

Perfect. I will get some answers ready. Thanks!!!

Regards,

Gerald Fisher, P.E. | Public Works Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.6855 | Direct: 503.759.0218

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: Leota Childress <lchildress@cityofmolalla.com>

Sent: Wednesday, January 22, 2020 2:33 PM

To: Gerald Fisher <gfisher@cityofmolalla.com>

Subject: Chapter 13.08 Sanitary Sewers

If I come to meeting tonight looking cross-eyes, it is YOUR fault. Slow going but wanted to send you questions/comments that I have for now.

Page 3

13.08.010 Definitions

“Operation” means control of the unit processes and equipment which make up the treatment works. This includes financial and personnel management, records, laboratory control, process control, safety and emergency operation planning.

Describe type of records?

Page 3

“Operation and maintenance” means activities required to assure the dependable and economical function of the treatment works. New

“Replacement” means expenditures for obtaining and installing equipment, accessories or appurtenances which are necessary during the useful life of the treatment works to maintain the capacity and performance for which such works were designed and constructed. The term “operation and maintenance” includes replacement. New

  1. 1. Should "Operation and Maintenance" be "means activities, including replacement, to assure...."
  2. 2. Does "Replacement" always mean expenditures? If so, is it "replacement cost"? Or is it "Replacement is obtaining....", striking means expenditures

 

Page 4

“Useful life” means the period during which a treatment works is planned and designed to be operated. New

Found this:

Useful life is the estimated lifespan of a depreciable fixed asset (or water treatment plant), during which it can be expected to operate. (???)

Page 5

3.08.040 Application for service. New

B. Two or more parties who join to make application for service are jointly and individually liable and will be sent a single billing.

... who join together to make... or who jointly make.

E. If a premises is connected to the City utility system without application, the City will disconnect the premises.

disconnect the premises or services?

Page 7

13.08.070 Service connection charges – Generally. Renumbered

A. There is levied and imposed upon the owner of any property connecting to the sanitary sewer system of the City of Molalla a connection charge, which shall be paid prior to such connection.

How about "A connection charge is levied and imposed"....

Page 7

13.08.080 Rates – Outside - City

B. The rate schedule for outside service shall in no instance be less than the rates charged for residents within the City,

Add limits (City limits) to be consistent with other paragraphs

Page 7

13.08.110 Revenues – Deposit and use. New

The Finance Director is directed to deposit in the...

The Finance Director will deposit

Pages 7 & 8 re payments, etc. - Sometimes refer to Finance Director and other finance department.

Page 8 13.08.140

D. In no event may an adjustment be made for more than six consecutive months’ worth of billing.

strike "worth"

13.08.150 Adjustment of accounts – No service provided. New

If a customer pays for utility services not actually received as a result of the City’s error, the City will refund the amount paid for services not received, but only for a period not to exceed one year from the date the customer notified the City.

Not sure I understand what this is saying. Sounds like we have one year to issue the refund?

Pages 8-9

13.08.160 Adjustment of accounts – No service provided. New

  1. 1. Seems the same steps are repeated?
  2. 2. Also, there is mention of 30 days in several places but Section B reads, in part, "Adjustments to the bill may not exceed two months from the date before the customer fixes the leak."

 

Page 9

13.08.170 Liens for delinquent utility account. New

Utility service charges become a lien against the premises served from and after the date of billing and entry on City records pertaining to the utility system.

A lien will be filed against... for delinquent utility service charges.

At what point are we filing a lien against the property owner? Is that at 90 days? What is the step-by-step process with time lines? Does that need to be spelled out here or is it somewhere else?

Leota Childress

City Council President

City of Molalla

503.829.6855