Public Works Administrative Fees
Exhibit “A”
Adopted by Resolution 2021-XX
Water & Sewer Fees
Water Hook Up Fee $600.00
Sewer Hook Up Fee $600.00
Bulk Water Fees (see note below)
Bulk Water Meter Deposit (refundable) $700.00
Bulk Water Meter Account Setup $25.00
Bulk Water (1000 gal = 133.681 CF)
Bulk Water Cost Current Water Use Rate per hundred cubic feet (Ccf)
Note: Bulk water can only be provided to construction contractors performing work within the City limits or contractors performing work outside of City limits for Clackamas County, ODOT, or other public agency as approved by the Public Works Director. Sale of bulk water outside of corporate City limits not identified above is prohibited.
Engineering Fees
Engineering Design Review Fee
1.5% of the total the Engineer's Estimate of the public improvements, but not less than $300.00
Construction Permit Fee
3.5% of the total the Engineer's Estimate of the public improvements, but not less than $700.00
Right-of-Way Permit Fees
Right-Of-Way Permit Fee (non-franchise) $125.00
Right-Of-Way Permit Fee (non-franchise) - with Street Cut $150.00 ea. Cut
Reinspection - Right-Of-Way Permit Fee (non-franchise) $75.00
Driveway, Sidewalk, and/or Curb & Gutter Const Permit Fee $95.00
Reinspection - Driveway, Sidewalk, and/or Curb & Gutter $47.00
Plotter Fees
Base Rate Per Request $12.50
Page Size Cost / Sheet
24" x 18" ……………………………………………………………………………………………… $0.23
24" x 30" ……………………………………………………………………………………………… $0.36
24" x 36" ……………………………………………………………………………………………… $0.41
36" x 44" ……………………………………………………………………………………………… $0.76
Fee charged will be equal to the Base Rate plus the cost per sheet.
Public Easement and Right of Way Dedication Fees
Fees charged will be equal to the cost (staff/vehicle time and recording expense) for City to process and record easement and dedication documents at the Clackamas County Recorder’s Office. Applicant will reimburse City prior to occupancy approval and project acceptance.
Advance Financing of Public Improvement Fees
Application Fee $1,500.00