From: Ian Gelbrich
Sent: Tue Aug 23 12:33:45 2016
To: communityplanner@cityofmolalla.com
Subject: Schedule Estimate
Importance: Normal
My name is Ian Gelbrich and I’m pursuing the design of a building project in the City of Molalla. As part of my proposal I’m developing a draft of a project schedule and would like to be able to show how long both the land use review as well as the building permit review might take. Can you provide me with a range of time that I could expect for each of these procedures? I’m anticipating a project that will require a Type III Site Design Review and Type III Conditional Use Review.
Thanks so much,
Ian
Ian Gelbrich, AIA | Associate
FFA Architecture and Interiors Inc.
“Design excellence since 1956.”
503.327.0330 direct | 520 SW Yamhill Street Suite 900 Portland OR 97204 | www.ffadesign.com
PRIVILEGED AND CONFIDENTIAL COMMUNICATION-This electronic transmission, including any attachments, may contain confidential and/or privileged information. This communication is to be used only by the intended recipient. The intended recipient may not reproduce, disclose to a third party or use the information except for the specific purpose for which it was provided, without the prior written approval of FFA Architecture and Interiors, Inc. If you received this e-mail in error, please notify the sender and delete the e-mail. Any disclosure, copying, distribution, or use of information received in error is strictly prohibited.