From: Jennifer Cline

Sent: Tue Dec 29 15:03:47 2015

To: Mark Strandberg

Cc: dhuff@cityofmolalla.com; J.W. Ring; Christine Hein

Subject: RE: DRAFT_15-1229 follow-up report to DEQ

Importance: Normal

Attachments: DRAFT_15-1229 follow-up report to DEQ2.docx;

 

Hi Mark,

Please make a final review before I send this off to Tiffany.

I also added another comment as to why I reduced the discharge quantity. I contacted the pump company to help calculate the head loss from the pipe to the discharge point. Although the pump can do the 1200 gal/min. with head loss, (back pressure from the pipe and bends in the pipe) the actual discharge is closer to 1100 gal/min.

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Mark Strandberg [mailto:MStrandberg@ringbenderlaw.com]

Sent: Tuesday, December 29, 2015 2:19 PM

To: jcline@cityofmolalla.com

Cc: dhuff@cityofmolalla.com; J.W. Ring <JWRing@ringbenderlaw.com>; Christine Hein <CHein@ringbenderlaw.com>

Subject: DRAFT_15-1229 follow-up report to DEQ

Jen:

Here is a version with your comment addressed. As soon as you have the estimate of the end date, email a copy to Tiffany and David, with a hard copy mailed to the physical address.

Thank you,

Mark