From: Andy Peters

Sent: Wed Dec 11 07:53:55 2019

To: 'Jonathan Sheckard'

Cc: Jake Ehredt; Adam Shultz; Ryan Hepler; Gerald Fisher

Subject: Our numbers

Importance: Normal

 

Jonathan, here is how our team interpreted the sludge judges, feel free to tell us where we’ve made any mistakes. You are welcome to use this text for your report if it’s correct, assuming our numbers match.

Executive Summary:

Based on initial sludge judges done in 2018 of 7037 Dry Tons, and the final sludge judges done in 2019 of 6338 dry tons, to the best of our knowledge total % removed as of December 2019 is estimated to be 10%.

Results:

START

 

    
 

Lagoon 1

 

2/18

 

6663.00

 

dry tons

 

 

Lagoon 2

 

11/18

 

207.00

 

dry tons

 

 

AB

 

11/18

 

167.00

 

dry tons

 

  

TOTAL

 

7037.00

 

 
     

END

 

    
 

Lagoon 1

 

11/19

 

3709.00

 

dry tons

 

 

Lagoon 2

 

12/19

 

2638.00

 

dry tons

 

 

AB

 

12/19

 

1.37

 

dry tons

 

  

TOTAL

 

6338.37

 

 
    

TOTAL REMOVAL

 

7037.00-6338.37=

 

698.63

 

PERCENT REMOVAL

 

  

9.93%

 

    

SANITY CHECK:

 

  

As of 12/19 total hauled on manifests is 999 dry tons.

 

This means for the sludge judge numbers to be accurate the plant must have taken on ~300 dry tons during the period.

 

If we assume the original 7037 tons was accumulated

 

over 30 years (or 40 years with a growing population),

 

then this annual dry ton loading makes sense, and so the percent removal makes engineering sense also.

 

 

Respectfully,

Andy Peters

City of Molalla

Public Works Operations Supervisor

(503) 829-6855 x220

Cell: 503-793-0507

apeters@cityofmolalla.com

117 N Molalla Ave

Molalla, OR 97038