From: Brandon LaVerne
Sent: Tue Feb 05 17:11:49 2019
To: Andy Peters
Cc: John Keppler; Alexa Karmil
Subject: RE: PROJECT: Freyer Park Road Cathotic Protection
Importance: Normal
Attachments: image001.jpg; Q-16865-City_of_Molalla-Rectifier_Replacement-Proposal.pdf; Hi Andy, Thank you for contacting Farwest with this request. Based upon the information we received, please view the attached proposal letter regarding the rectifier replacement and post-installation inspection work required at the Freyer Park Road location. To summarize: 1. Farwest has provided the costs of a replacement rectifier, including shipping to the job-site. 2. Installation of the rectifier shall be provided by your local electrician. 3. Farwest has included budget for two (2) site inspection visits; a. The first visit will include: i. Installation inspection ii. Depolarized pipe-to-soil survey iii. Commissioning iv. Potential survey to establish appropriate output b. 30-days later, the second site visit will include: i. Current output measurement while rectifier is interrupted ii. Minor adjustments to rectifier iii. Written final report detailing work performed and results 4. Estimated delivery of the rectifier is 3-4 weeks from date of finalized purchase order. Feel free to contact me (mobile 425-425-4073) if you have any questions, require a correction, or would like to set-up these services. Kindly, Brandon LaVerne Brandon LaVerne - Business Development Specialist T: (425) 290-8832 | F: (425) 290-8773 | M: (425) 426-4073 4640 Campus Place, Suite 105, Mukilteo, WA 98275 From: John Keppler Sent: Wednesday, January 30, 2019 5:30 PM To: 'Andy Peters' <apeters@cityofmolalla.com> Cc: Brandon LaVerne <blaverne@farwestcorrosion.com> Subject: RE: PROJECT: Freyer Park Road Cathotic Protection Andy, Thanks for the info. Farwest will get you a proposal next week for a new rectifier, commissioning and post install test. I recommend you plan on having your local electrician handle the replacement of the post, meter, disconnect and wiring to the new unit. It will need to be permitted for the power company to provide a new meter. It will take a few trips and days to work all that out, so local will be better. If it has problems we will work it out. That rectifier was a 1977 unit. We will provide a cost for a new one. Based on the prior survey, I can estimate the work. John Keppler - Principal Corrosion Engineer T: (425) 290-8832 | F: (425) 290-8773 | M: (425) 501-3401 4640 Campus Place, Suite 105, Mukilteo, WA 98275 From: Andy Peters [mailto:apeters@cityofmolalla.com] Sent: Tuesday, January 29, 2019 12:04 PM To: John Keppler jkeppler@farwestcorrosion.com Cc: R Quigley <rquigley@dyerpart.com>; Adam Shultz <ashultz@cityofmolalla.com>; Gerald Fisher <gfisher@cityofmolalla.com> Subject: PROJECT: Freyer Park Road Cathotic Protection Mr. Keppler, I’m calling this repair Freyer Park Road Cathotic Protection repair. Attached please find: "https://www.farwestcorrosion.com/VeriFy/VeriCheck.png"
The Rectifier that has been hit is a GOOD-ALL electric Inc. Model FSAYSA 20-5 N, TYPE F, 115 volts, Amps AC 1.4, Phase 1, Hertz 60, Volts DC 20, Amps DC 5.
Is this enough information for you to get a proposal together for the City?
Thanks,
Andy Peters
City of Molalla
Public Works Operations Supervisor
(503) 829-6855 x220
Cell: 503-793-0507
117 N Molalla Ave
Molalla, OR 97038
From: John Keppler <jkeppler@farwestcorrosion.com>
Sent: Tuesday, January 29, 2019 9:56 AM
To: Andy Peters <apeters@cityofmolalla.com>
Subject: contact info
Hi
| John Keppler - Principal Corrosion Engineer
|
T: (425) 290-8832 | F: (425) 290-8773 | M: (425) 501-3401
| |
4640 Campus Place, Suite 105, Mukilteo, WA 98275
| |
| |