From: Gerald Fisher

Sent: Thu Oct 31 16:55:11 2019

To: Alice Cannon; Mike Penunuri

Subject: RE: ALICE'S PREP WORK FOR 3:00 PRE-APP WITH SPENCER VETTER RE: Pre-App11-2019 -- 14999 S. Highway 211: Questions and Answers

Importance: Normal

Attachments: image001.png;

 

Thanks again Alice for doing this look ahead.

Regards,

Gerald Fisher, P.E. | Public Works Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.6855 | Direct: 503.759.0218

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: Alice Cannon <acannon@cityofmolalla.com>

Sent: Thursday, October 31, 2019 11:37 AM

To: Mike Penunuri <penunuri@molallafire.org>; Gerald Fisher <gfisher@cityofmolalla.com>

Subject: ALICE'S PREP WORK FOR 3:00 PRE-APP WITH SPENCER VETTER RE: Pre-App11-2019 -- 14999 S. Highway 211: Questions and Answers

Here are the City’s responses to Pre-App questions presented by Stafford Land Company:

Transportation

  1. 1. Please discuss ODOT’s plans for OR 211 expansion and how it will impact our proposed

 

Subdivision

Stafford Land Company’s prior Subdivision application – P45-2016 – provides excellent background information for this pre-app. Here is an excerpt from the prior approved Appeal conditions for this site, as approved by Molalla City Council in February 2017:

13(A)(2). Highway 211is an arterial street under Oregon Department of Transportation (ODOT) jurisdiction. Current right-of-way width is 60 feet and approximate pavement width is 30 feet. Arterial streets (w/travel lanes, w/median, w/bike lanes, w/sidewalks, w/o parking) require 64 feet of right-of-way and 50 feet of pavement for areas with 6’ wide curb tight sidewalk. Applicant will be required to dedicate 2.5 feet of right-of-way and construct road improvements to State standards for 25 feet of pavement (CL to face of curb), curb and gutter, and 6 foot curb tight sidewalk. If required during design review by ODOT, additional striping and pavement tapers may be necessary to allow for pavement transitions and striping. Specific frontage design requirements to be determined during construction design phase.

2. Please discuss any frontage improvements our proposed subdivision will trigger. What frontage

improvements will our proposed subdivision trigger on OR-211?

Please see ODOT response above.

3. Please confirm the planned access point from the existing Right-of-Way on Coho St is acceptable

to the City.

??? GERALD

4. Please confirm the proposed hammerhead intersection is compatible with emergency vehicle

access needs.

??? MIKE PENUNURI AND GERALD

5. Please confirm the proposed private access and utility easements on Lot 1 and Lot 9 conform to

City standards.

The easements must meet this and any other standards Gerald and Mike Penunuri identify:

image

6. Please discuss any other known transportation issues that may affect our proposed subdivision.

On Stafford Land Company’s prior subdivision application (P45-2016), this transportation condition was applied to the subdivision. The pre-app subdivision plat shows a 10 foot wide access easement. Please expand this easement to 15 feet, as required below in 2016: (GERALD, DO YOU KNOW WHY WE REQUIRED 15 FEET, WHEN THE STANDARDS REQUIRE ONLY 6 FEET IN WIDTH??)

  1. 7. The applicant shall provide a 15 foot wide easement or right-of-way to the City of Molalla for future pedestrian access to Highway 211 at the time of final plat. The applicant shall provide a temporary removable wall section in the perimeter wall allowing for the future path. The City of Molalla shall be responsible for the future timing and construction of the pedestrian connection.

 

Services & Utilities

7. Please confirm Lot 6 of the Molalla River Estates subdivision is used for a storm water detention

facility.

GERALD?

8. Please provide any as-builts for the storm water detention facility used by the Molalla River

Estates subdivision including current capacity.

GERALD? Gerald, DZ downloaded these as-builts. You can find them at this link:

Y:\Planning Department\Active Development Projects\2019 - Active\Pre-Apps\Pre-App11-2019 (14999 S. Hwy. 211)\Molalla River Estates AsBuilts.pdf

9. Please confirm the existence and location of a storm water sewer pipe in the Molalla River

Estate subdivision on Coho Street.

GERALD?

10. Please let us know the nearest point of connectivity for utilities.

GERALD?

Land Use

11. Please confirm that Lot 9 meets the requirements of MMC 17-4.3.050 for a 20 %, 12’, lot width

adjustment.

Please show how the proposal can meet these standards, as outlined in MMC 17-4.3.050 (A):

A. Lot Size Averaging. To allow flexibility in subdivision design and to address physical constraints, such as topography, existing development, significant trees, and other natural and built features, the approval body may grant a 20 percent modification to the lot area and/or lot dimension (width/depth) standards in Chapter 17-2.2, provided that the overall density of the subdivision does not exceed the allowable density of the district and the approval body finds that all of the following are met:

1. Granting the modification is necessary to achieve planned housing densities, as allowed by the underlying zone, or to improve development compatibility with natural features or adjacent land uses;

2. The Planning Official may require screening, buffering, or other transitions in site design where substandard lots are proposed to abut standard- or larger-sized lots.

12. Please confirm there are no wetlands to the east of our property which will impact our proposed

subdivision.

The City’s 2001 Wetland Inventory does not show wetland in the right-of-way to the east of this property. However, the document is 18 years old. Stafford Land Company should complete this research independently.