From: Sam Miller
Sent: Tue Oct 15 16:00:54 2019
To: Gerald Fisher
Subject: 1441 W Main St. Sewer Connection.
Importance: Normal
Attachments: 20191015_02.jpg; 20191015_02.jpeg; 20191015_03.jpeg; Hey Gerald, Rick Miley, who has been hired by Dale Newcomb to tie in his sewer line. Rick has a few good question on how to tie into the exciting sewer main. There is a concrete service “T” connection that appears to have zero slope with a plug in it. I’m not for sure if he will be able to use it for the connection. I was thinking of sealing of the T and adding a saddle to make the connections or would there be a way for Rick to make the connection with the exciting conditions. Plus has Dale paid for his SDC and submitted a design plan with approval? Thanks, Sam Miller | Sr. Engineer Tech. City of Molalla 117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038 T : 503-759-0217 | E: smiller@cityofmolalla.com