From: Brenda Reiner
Sent: Tue Dec 12 10:28:03 2017
To: Peter Burkoff
Cc: Gerald Fisher
Subject: RE: Utilities/Side walk permits
Importance: Normal
Peter,
Three or four concrete panels are out of compliance with the maximum allowed cross slope of 2%, on your recent driveway and sidewalk pour. Please consider this written notice to remove and replace. Please call for an inspection when the forms are set.
Thanks,
Brenda Reiner | Senior Engineering Technician
City of Molalla
117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038
Office: 503.759.0243 I Fax: 503.829.3676
From: Brenda Reiner [mailto:breiner@cityofmolalla.com]
Sent: Thursday, September 07, 2017 10:47 AM
To: Peter Burkoff <pbsilverfalls@live.com>
Subject: FW: Utilities/Side walk permits
Peter,
I got ahold of your plan from Gerald. We are OK with this plan as long as you pour the other driveway as soon as the phase 1 driveway is ready for traffic. We still need you to submit for a right of way permit.
Brenda Reiner | Senior Engineering Technician
City of Molalla
117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038
Office: 503.759.0243 I Fax: 503.829.3676
From: Peter Burkoff [mailto:pbsilverfalls@live.com]
Sent: Thursday, September 07, 2017 8:02 AM
To: Gerald Fisher <gfisher@cityofmolalla.com>
Subject: Utilities/Side walk permits
Good Morning!
Gerald, I have attached document showing that I would like to start phase 1 with the sidewalk. Once utilities are ran I would like to finish phase 2 and complete the other side of the side walk. Can you provide information on how to go about pulling permit for the sidewalk and any information on pulling permit with running utilities.
Thanks,
Peter Burkoff
917 Toliver Rd
Molalla, OR 97038
503.930.2087