From: Gerald Fisher
Sent: Tue Feb 12 18:17:02 2019
To: 'Kaitlin Berger'
Cc: 'Jeff Shoemaker'; 'Mike Penunuri'
Subject: RE: Molalla Partition app
Importance: Normal
Microsoft Exchange Server;converted from html;
From our discussion, if the sewer can be served from Main Street through the Urgent Care site then it wouldn’t affect the roadway. The waterline may be required to be looped through the site, depending on the Fire Marshall’s review, and there is a provision in Chapter 13.04.360 that waterline extensions go the furthest point of the property. Per the Public Works Standards, the water system is 8-inch minimum and located 12 feet south of the right of way centerline which is within the street improvement section. The first thing you will need to verify is if the building needs to be sprinklered or if an additional fire hydrant is required on site. The existing 6 inch onsite may not have enough capacity and that would require a looping of the waterline from Hezzie Lane east along West Lane to the east edge of the property and then into the site to link up with the 6 inch on the Urgent Care site. Another option would be to extend the waterline and provide a hydrant on West Lane for fire use. Mike Penunuri, Fire Marshall will need to chime in on this.
Mike - A preapp was held regarding this partition. Let me know if you have any questions.
Regards,
Gerald Fisher, P.E. | Public Works Director
City of Molalla
117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038
Office: 503.829.6855 | Direct: 503.759.0218
CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.
From: Kaitlin Berger
Sent: Tuesday, February 12, 2019 1:10 PM
To: Gerald Fisher
Cc: Jeff Shoemaker
Subject: RE: Molalla Partition app
Thank you for this information. To confirm, it appears that just frontage improvements will be required with this partition, and that the sewer and water connections to serve Lot 3 would be required when development is proposed?
Thanks,
Kaitlin
Kaitlin W. Berger, AICP
Land Use Planner
DOWL
971.280.8641 | office
971.229.8325 | direct
From: Gerald Fisher gfisher@cityofmolalla.com>
Sent: Wednesday, February 6, 2019 5:10 PM
To: Kaitlin Berger kberger@dowl.com>
Cc: Jeff Shoemaker jshoemaker@dowl.com>
Subject: RE: Molalla Partition app
Hi Kaitlin,
Please see attached. The section you are looking for is section 3 on page 2. Any land use approval triggers the requirements for frontage improvements to be completed for the balance of Hezzie Lane and the south side of West Lane. The dentist office did perform their portion of the widening so all that is left is the widening of the rest of the roadway to meet City standards. Hezzie Lane is designated as a Neighborhood Street. The curb to curb width is 36 feet with 6 foot wide curb tight sidewalks. West Lane is a local street requiring at least 20 feet of pavement (fire requirements) so the 18 foot plus 2 feet on north side of the ROW centerline and curb tight sidewalks. The cross sections are shown in Exhibits 6 and 7. The PUE requirements is 10 feet wide along all frontages.
Hope this is what you were looking for. Thanks and have a good evening.
Regards,
Gerald Fisher, P.E. | Public Works Director
City of Molalla
117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038
Office: 503.829.6855 | Direct: 503.759.0218
CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.
From: Kaitlin Berger kberger@dowl.com>
Sent: Wednesday, February 06, 2019 3:45 PM
To: Gerald Fisher gfisher@cityofmolalla.com>
Cc: Jeff Shoemaker jshoemaker@dowl.com>
Subject: Molalla Partition app
Hi Gerald,
Thank you for the information last week regarding the Partition application we are working on for 861 W Main Street/ TLID 52E08B 04300. You mentioned you would look in to the development agreement for the site to confirm if utilities connections to Lot 3 would be required to be provided with this Partition application or when future development is proposed. I will be out of the office for the majority of the next two weeks, so I wanted to ask if you would reply to this email when you have that information so Jeff, who is cc’ed here, will see it.
Please let me know if you have any questions.
Thank you,
Kaitlin
Kaitlin W. Berger, AICP
Land Use Planner
DOWL
971.280.8641 | office
971.229.8325 | direct
720 SW Washington Street, Suite 750
Portland, Oregon 97205
who we are | what we do