From: Nathan McCarty
Sent: Mon Nov 07 13:15:55 2016
To: gfisher@cityofmolalla.com
Subject: 829 Toliver Road Pre-Application Conference
Importance: Normal
Attachments: image001.jpg; Gerald, I am working on the project located at 829 Toliver Road that the pre-application meeting was on last week. I am trying to find out more about the existing 10” and 18” storm drainage system in Toliver Road. Specifically, at what point in the drainage system downstream of this address does the pipe size increase? If you have a storm drainage conveyance map or other pipe size and routing information you could send over, it would be greatly appreciated. Regards, Nathan McCarty - EI AKS ENGINEERING & FORESTRY, LLC 12965 SW Herman Road, Suite 100 | Tualatin, OR 97062 P: 503.563.6151 Ext. 214 | F: 503.563.6152 | www.aks-eng.com | mccartyn@aks-eng.com Offices in: Tualatin, OR | Salem-Keizer, OR | Vancouver, WA NOTICE: This communication may contain privileged or other confidential information. If you have received it in error, please advise the sender by reply e-mail and immediately delete the message and any attachments without copying or disclosing the contents. AKS Engineering and Forestry shall not be liable for any changes made to the electronic data transferred. Distribution of electronic data to others is prohibited without the express written consent of AKS Engineering and Forestry.