From: Gerald Fisher
Sent: Mon Nov 07 15:30:30 2016
To: Nathan McCarty
Cc: Dan Zinder
Subject: RE: 829 Toliver Road Pre-Application Conference
Importance: Normal
Attachments: image001.jpg; Hi Nathan, It is 10”, 8”, and 6” on the north until Andrian Drive then it goes to 15” to Storey Drive and 18” south connecting to the south side storm line at Storey Drive. Contact Dan Zinder for more information. He has our GIS files. Regards, Gerald Fisher, P.E. | Public Works Director City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.829.6855 | Direct: 503.759.0218 CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you. From: Nathan McCarty [mailto:McCartyN@aks-eng.com] Sent: Monday, November 07, 2016 1:16 PM To: gfisher@cityofmolalla.com Subject: 829 Toliver Road Pre-Application Conference Gerald, I am working on the project located at 829 Toliver Road that the pre-application meeting was on last week. I am trying to find out more about the existing 10” and 18” storm drainage system in Toliver Road. Specifically, at what point in the drainage system downstream of this address does the pipe size increase? If you have a storm drainage conveyance map or other pipe size and routing information you could send over, it would be greatly appreciated. Regards, Nathan McCarty - EI AKS ENGINEERING & FORESTRY, LLC 12965 SW Herman Road, Suite 100 | Tualatin, OR 97062 P: 503.563.6151 Ext. 214 | F: 503.563.6152 | www.aks-eng.com | mccartyn@aks-eng.com Offices in: Tualatin, OR | Salem-Keizer, OR | Vancouver, WA NOTICE: This communication may contain privileged or other confidential information. If you have received it in error, please advise the sender by reply e-mail and immediately delete the message and any attachments without copying or disclosing the contents. AKS Engineering and Forestry shall not be liable for any changes made to the electronic data transferred. Distribution of electronic data to others is prohibited without the express written consent of AKS Engineering and Forestry.