From: John Raugust
Sent: Mon Jun 01 10:11:15 2020
To: Jon Morse
Cc: Gerald Fisher; Sam Miller
Subject: FW: Lakota Lane project
Importance: Normal
Attachments: image001.jpg; message.wav; Hey Jon, See the below email and attached voicemail. Regards: John Raugust, PE, LSI AKS ENGINEERING & FORESTRY, LLC 12965 SW Herman Road, Suite 100 | Tualatin, OR 97062 P: 503.563.6151 ext. 272| F: 503.563.6152 | www.aks-eng.com | JohnR@aks-eng.com Offices in: Bend, OR | Keizer, OR | Tualatin, OR | Vancouver, WA NOTICE: This communication may contain privileged or other confidential information. If you have received it in error, please advise the sender by reply e-mail and immediately delete the message and any attachments without copying or disclosing the contents. AKS Engineering and Forestry shall not be liable for any changes made to the electronic data transferred. Distribution of electronic data to others is prohibited without the express written consent of AKS Engineering and Forestry. From: Gerald Fisher <gfisher@cityofmolalla.com> Sent: Monday, June 01, 2020 9:46 AM To: John Raugust <JohnR@aks-eng.com> Cc: Sam Miller <smiller@cityofmolalla.com> Subject: Lakota Lane project EXTERNAL EMAIL: This email originated from outside of AKS Engineering & Forestry. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi John, Received the attached voicemail from Jonathon Morris but don’t have his email. Can you forward this message to him? Thanks. Hi Jonathon, Am working remotely this week from home but will be back in the office next week. If this is the condo project then the onsite sewer and stormwater piping is under plumbing code requirements overseen by the County as our contract building department. Public sewer will end at the ROW with a cleanout. From there into the site is all private plumbing because it is not in a public roadway. For storm, it also is private onsite but the stormwater detention and water quality requirements have to meet Ch 3 of the Public Works Standards which are available on our website. The sewer and stormwater improvements in Toliver Road are all public and are to be constructed to PW standards. I’m not sure if this project has actually submitted an application or not so most of this is fluid until we receive an actual application that we can comment on and set the requirements. In other words, what I’m telling you may change depending on what is submitted in a formal application. See AKS’s notes from our preapplication meeting and chat with Monte about the project. Also, please include Sam Miller in future emails since he will be reviewing the plans with me and inspecting the improvements. Thanks. Regards, Gerald Fisher, P.E. | Public Works Director City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.829.6855 | Direct: 503.759.0218 CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.