From: Gerald Fisher
Sent: Tue Feb 13 16:00:14 2018
To: Aldo Rodriguez
Subject: RE: 600 W Main Street development
Importance: Normal
Attachments: 20180213 PW Conditions of Approval - Second Revision.pdf; Aldo, Please see attached. Regards, Gerald Fisher, P.E. | Public Works Director City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.829.6855 | Direct: 503.759.0218 CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you. From: Aldo Rodriguez [mailto:arodriguez@cityofmolalla.com] Sent: Tuesday, February 13, 2018 3:35 PM To: Gerald Fisher <gfisher@cityofmolalla.com> Subject: RE: 600 W Main Street development Hey Gerald, Can you send me an amended CofA for this application please. Aldo Rodriguez | Community Planner City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.759.0219 I Fax: 503.829.3676 From: Gerald Fisher [mailto:gfisher@cityofmolalla.com] Sent: Wednesday, January 31, 2018 9:51 AM To: Jessica Hijar <jessica@lancasterengineering.com> Cc: Brian Davis <brian@lancasterengineering.com>; Abraham.TAYAR@odot.state.or.us; Bryan Dickerson <bdickerson@pacland.com>; Aldo Rodriguez (Molalla) <arodriguez@cityofmolalla.com> Subject: RE: 600 W Main Street development Hi Jessica, In addition to the intersections you have looked at which are: · Hwy 213/Hwy 211 · Dixon Ave/Hwy 211 · Molalla Ave/Hwy 211 The City agrees that the intersections of Hezzie, Leroy, Ridings, and Shaver will also be looked at for additional capacity and signal warrant analysis. Kennel/Hart, as listed in Public Works condition of approval will not be required to be included in the traffic study. Thank you. Aldo – Consider this email as a change in Public Works CofA #6. If you need an amended CofA then let me know. Thanks. Regards, Gerald Fisher, P.E. | Public Works Director City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.829.6855 | Direct: 503.759.0218 CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you. From: Jessica Hijar [mailto:jessica@lancasterengineering.com] Sent: Tuesday, January 30, 2018 2:23 PM To: Abraham.TAYAR@odot.state.or.us; gfisher@cityofmolalla.com; Bryan Dickerson <bdickerson@pacland.com> Cc: Brian Davis <brian@lancasterengineering.com> Subject: 600 W Main Street development Hello All- I just wanted to summarize our conference call this morning so that everyone is on the same page since it was decided that some of the recommended intersections would not need to be analyzed. Based on our discussion, additional capacity and signal warrant analysis will be required for the following intersections:
Traffic counts from previous analysis performed by Kittleson and Associates will be used, therefore no additional counts will be required.
Please confirm and I will begin the additional analysis as soon as possible.
Thanks,
Jessica
--
Jessica Hijar | Transportation Analyst
321 SW 4th Avenue, Suite 400 | Portland, OR 97204
O: 503-248-0313 | jessica@lancasterengineering.com
Offices: Portland, OR | Bend, OR