From: Peter Burkoff
Sent: Thu Mar 22 08:47:42 2018
To: Brenda Reiner
Subject: Re: Storm
Importance: Normal
Finishing sidewalk will be in phase 2 like we talked about after all Utilities are in the ground and approved. And up sizing pipe means I have remove sidewalk and most likely go to clean out to clean out on the street and it’s on Neighbors side which will require an Easement.
Sent from my iPhone
> On Mar 22, 2018, at 8:41 AM, Brenda Reiner <breiner@cityofmolalla.com> wrote:
>
> Peter,
> In the past there was no real oversight of this specific issue. Molalla
> has very high ground water tables (as you know if you dig in your yard).
> The water is high and the soil is poor draining - this mix creates mold
> and dry rot, drainage problem, and worse. We are trying to stop this from
> happening by our standards. You have class 4 soils at your site and they
> don't drain. Honestly your best bet is to try to upsize the on street
> system and try and see if you can gravity flow. Other than that it seems
> like the water will evaporate from the pond about the same rate it will go
> into the ground.
>
> The City manager and Public Works director are working on the storm
> reviewal process with the county now and I'll let you know when they give
> me direction. In the mean time you can finish up your conditions of
> approval for your lot split, like finish your sidewalk and put up your
> sign.
>
> Thanks,
>
>
> Brenda Reiner | Senior Engineering Technician
>
> City of Molalla
>
> 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038
>
> Office: 503.759.0243 I Fax: 503.829.3676
>
> -----Original Message-----
> From: Peter Burkoff [mailto:pbsilverfalls@live.com]
> Sent: Thursday, March 22, 2018 8:36 AM
> To: Brenda Reiner <breiner@cityofmolalla.com>
> Subject: Re: Storm
>
> What the other storm systems in the past who revived and approved them?
>
> Sent from my iPhone
>
>> On Mar 21, 2018, at 11:05 AM, Brenda Reiner <breiner@cityofmolalla.com>
> wrote:
>>
>> Peter,
>> There has been discussions with Clackamas County regarding who reviews
>> and approves the private on site storm. I'm still waiting for an
>> answer on this.
>> Thanks,
>>
>>
>> Brenda Reiner | Senior Engineering Technician
>>
>> City of Molalla
>>
>> 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038
>>
>> Office: 503.759.0243 I Fax: 503.829.3676
>>
>> -----Original Message-----
>> From: Peter Burkoff [mailto:pbsilverfalls@live.com]
>> Sent: Wednesday, March 21, 2018 9:34 AM
>> To: breiner@cityofmolalla.com
>> Subject: Storm
>>
>> Any luck on reviewing email that was sent last week?
>>
>> Sent from my iPhone