From: Peter Burkoff

Sent: Thu Mar 22 08:47:42 2018

To: Brenda Reiner

Subject: Re: Storm

Importance: Normal

 

Finishing sidewalk will be in phase 2 like we talked about after all Utilities are in the ground and approved. And up sizing pipe means I have remove sidewalk and most likely go to clean out to clean out on the street and it’s on Neighbors side which will require an Easement.

 

Sent from my iPhone

 

> On Mar 22, 2018, at 8:41 AM, Brenda Reiner <breiner@cityofmolalla.com> wrote:

>

> Peter,

> In the past there was no real oversight of this specific issue. Molalla

> has very high ground water tables (as you know if you dig in your yard).

> The water is high and the soil is poor draining - this mix creates mold

> and dry rot, drainage problem, and worse. We are trying to stop this from

> happening by our standards. You have class 4 soils at your site and they

> don't drain. Honestly your best bet is to try to upsize the on street

> system and try and see if you can gravity flow. Other than that it seems

> like the water will evaporate from the pond about the same rate it will go

> into the ground.

>

> The City manager and Public Works director are working on the storm

> reviewal process with the county now and I'll let you know when they give

> me direction. In the mean time you can finish up your conditions of

> approval for your lot split, like finish your sidewalk and put up your

> sign.

>

> Thanks,

>

>

> Brenda Reiner | Senior Engineering Technician

>

> City of Molalla

>

> 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

>

> Office: 503.759.0243 I Fax: 503.829.3676

>

> -----Original Message-----

> From: Peter Burkoff [mailto:pbsilverfalls@live.com]

> Sent: Thursday, March 22, 2018 8:36 AM

> To: Brenda Reiner <breiner@cityofmolalla.com>

> Subject: Re: Storm

>

> What the other storm systems in the past who revived and approved them?

>

> Sent from my iPhone

>

>> On Mar 21, 2018, at 11:05 AM, Brenda Reiner <breiner@cityofmolalla.com>

> wrote:

>>

>> Peter,

>> There has been discussions with Clackamas County regarding who reviews

>> and approves the private on site storm. I'm still waiting for an

>> answer on this.

>> Thanks,

>>

>>

>> Brenda Reiner | Senior Engineering Technician

>>

>> City of Molalla

>>

>> 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

>>

>> Office: 503.759.0243 I Fax: 503.829.3676

>>

>> -----Original Message-----

>> From: Peter Burkoff [mailto:pbsilverfalls@live.com]

>> Sent: Wednesday, March 21, 2018 9:34 AM

>> To: breiner@cityofmolalla.com

>> Subject: Storm

>>

>> Any luck on reviewing email that was sent last week?

>>

>> Sent from my iPhone