From: Brenda Reiner
Sent: Fri Aug 17 09:49:21 2018
To: 'Peter Burkoff'
Subject: 600 Rivers Lane
Importance: High
Peter,
This is a written follow up of our conversation this morning regarding traffic control and shoring.
Once you are done with the sewer and water connections you will need to T-cut 12” the trench line. You need to backfill the trench surface with cold mix or hot mix but don’t leave it gravel.
Thanks,
Brenda Reiner | Senior Engineering Technician
City of Molalla
117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038
Office: 503.759.0243 I Fax: 503.829.3676