From: Brenda Reiner

Sent: Wed May 30 08:30:31 2018

To: Kyllotreeman@molalla.net

Subject: 308 Cole

Importance: Normal

Attachments: 308 Cole Storm Chamber Inspection - Needs Corrections.pdf;

 

Attached is the inspection report for your storm chambers. Please put the pea gravel (already in trench) to the bottom on trench and then place round river drain rock into trench around storm chamber. Please document the drain rock with a receipt (for rock) and a photo (email to me) or you can call me to reinspect before you backfill.

Thanks,

Brenda Reiner | Senior Engineering Technician

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.759.0243 I Fax: 503.829.3676