From: Brenda Reiner
Sent: Wed May 30 08:30:31 2018
To: Kyllotreeman@molalla.net
Subject: 308 Cole
Importance: Normal
Attachments: 308 Cole Storm Chamber Inspection - Needs Corrections.pdf; Attached is the inspection report for your storm chambers. Please put the pea gravel (already in trench) to the bottom on trench and then place round river drain rock into trench around storm chamber. Please document the drain rock with a receipt (for rock) and a photo (email to me) or you can call me to reinspect before you backfill. Thanks, Brenda Reiner | Senior Engineering Technician City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.759.0243 I Fax: 503.829.3676