Hello Ray,
Once the project has been completed, and all Condition have been meet. I will conduct a final inspection on all Public Work infrastructure. Minimum requirement for Asphalt listed below.
Let me know if you have any question, thanks.
Regards,
Sam Miller | Sr. Engineer Tech.
City of Molalla
117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038
T : 503-759-0217 | E: smiller@cityofmolalla.com
From: RAY BELL <bellsconstruction@msn.com>
Sent: Thursday, June 3, 2021 9:03 AM
To: Sam Miller <smiller@cityofmolalla.com>
Subject: eckerd ave.
sam,
curb and gutter are all poured on eckerd. didn't know if you did an after pour inspection? turned out pretty good...
also, looking to get paver lined up to patch the street. what's the thickness required there for the asphalt? i know joe hurd had nw geotechnical out there testing compaction when he was backfilling the ditches so i'm hoping that part is all complete and all we need to do is pave........
let me know if i'm missing anything before we proceed.
thank you
ray 503-313-9228