From: Karina Adams

Sent: Tue Oct 22 17:02:51 2019

To: Gerald Fisher

Subject: 124 Berkley Project - Driveway

Importance: Normal

Attachments: 2019_1022 124 Berkley SIDEWALK SKETCH.pdf;

 

Hi Gerald,

 

Per our conversation Friday, I have been looking at how to add a driveway to the 124 Berkley project. When we spoke, we were thinking we could get a driveway in between the power pole and the west property line. However, the pole is actually 26' from the property line. Even if I were to have them build the smallest 12 foot wide residential driveway, the 7' required Normals on either side of the driveway would put the concrete into the center of the power pole. Do you have an alternative options for me? Are there any exceptions to the 7' Normals or 12' minimum driveway?

 

Please see the attached sketch. I've bubbled the area I am speaking of.

 

Thank you,

 

Karina

 

Karina Adams Architecture LLC

Residential & Commercial

 

Architecture and Interior Design

Portland and Surrounding Areas

 

www.KarinaAdamsArchitecture.com

503-753-2916