From: DAVID CHRISTENSEN
Sent: Fri Oct 09 10:05:24 2020
To: Sam Miller
Subject: Re: 114 Robbins St. ROW Permit
Importance: Normal
We should be done by the end of the year. Plan is to do sewer and water connections in the next 2 weeks. The plumber will give me a day when he calls back. PGE design lady has yet to verify our electrical connection conduit. I plan on moving ahead on everything else. What is the best plan of action for taking out a section of sidewalk and drilling the rain drain weep hole. I presume those are my responsibilities. What are the city requirements if any? Thanks David
On Fri, Oct 9, 2020, 8:27 AM Sam Miller <smiller@cityofmolalla.com> wrote:
David,
Do you have a completion date in mind or a updated schedule. So I can update your permit. Thanks.
Regards,
Sam Miller | Sr. Engineer Tech.
City of Molalla
117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038
T : 503-759-0217 | E: smiller@cityofmolalla.com
From: DAVID CHRISTENSEN <dnc727@gmail.com>
Sent: Thursday, October 8, 2020 8:05 PM
To: Sam Miller <smiller@cityofmolalla.com>
Subject: Re: 114 Robbins St. ROW Permit
Yes we will need the one time extension for hookup. PGE has really complicated what should have been a simple process.
Thanks again David
On Wed, Oct 7, 2020 at 3:41 PM Sam Miller <smiller@cityofmolalla.com> wrote:
Hello David,
As long as the water is ran through the meter, I fine with your Plumber connection to the back side for water access.
Regards,
Sam Miller | Sr. Engineer Tech.
City of Molalla
117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038
T : 503-759-0217 | E: smiller@cityofmolalla.com
From: DAVID CHRISTENSEN <dnc727@gmail.com>
Sent: Wednesday, October 7, 2020 12:21 PM
To: Sam Miller <smiller@cityofmolalla.com>
Subject: Re: 114 Robbins St. ROW Permit
On a side note can we get a hose connection at the water meter. I was told to talk to you.
On Wed, Oct 7, 2020, 12:19 PM DAVID CHRISTENSEN <dnc727@gmail.com> wrote:
We are held up by PGE. They were 4 to 6 months to move the pole, we are now at 4 months. I guess I was unaware about a time on sewer connection. All permits are active with regular inspections. We are at finish sheetrock on interior walls. Thanks David
On Wed, Oct 7, 2020, 11:34 AM Sam Miller <smiller@cityofmolalla.com> wrote:
Good Afternoon David,
Just following up with the Public Works Permit PW28-2020. Wondering where we sit for completion. Permit expired back on 9/30/2020. I haven’t received any inspection requests for sanitary sewer connection with cleanout, water service, relocation of utility pole, Storm weep hole or sidewalk replacement. Let me know if you need more time. I can give you a onetime extension on the permit. Thanks.
Regards,
Sam Miller | Sr. Engineer Tech.
City of Molalla
117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038
T : 503-759-0217 | E: smiller@cityofmolalla.com
From: DAVID CHRISTENSEN <dnc727@gmail.com>
Sent: Thursday, April 16, 2020 10:30 PM
To: Sam Miller <smiller@cityofmolalla.com>
Subject: Re: 114 Robbins St. ROW Permit
Great, thanks!
On Thu, Apr 16, 2020 at 11:17 AM Sam Miller <smiller@cityofmolalla.com> wrote:
Hello David,
I’m doing well, thanks for asking. Hope everything is going good for you too.
The job site looks great. Your good to proceed on my end. Let me know if you have any question. Thanks.
Regards,
Sam Miller | Sr. Engineer Tech.
City of Molalla
117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038
T : 503-759-0217 | E: smiller@cityofmolalla.com
From: DAVID CHRISTENSEN <dnc727@gmail.com>
Sent: Wednesday, April 15, 2020 8:21 PM
To: Sam Miller <smiller@cityofmolalla.com>
Subject: Re: 114 Robbins St. ROW Permit
Hi Sam,
Hope all is good with you. The 114 Robbins St. project is ready
for your inspection for silt barrier and bio bags around the
street drain and driveway. Fencing is up but not locked. Feel
free to go in.
Thanks David
On Mon, Apr 6, 2020 at 2:59 PM DAVID CHRISTENSEN <dnc727@gmail.com> wrote:
Sounds good.
On Mon, Apr 6, 2020, 2:54 PM Sam Miller <smiller@cityofmolalla.com> wrote:
Good Afternoon Ron,
See attached file for your records.
Dave,
I will need to be notified 24 hours in advance to inspect erosion control and before starting of construction. Please let me know if you have any question. Thanks.
Regards,
Sam Miller | Sr. Engineer Tech.
City of Molalla
117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038
T : 503-759-0217 | E: smiller@cityofmolalla.com