From: Sam Miller

Sent: Wed Oct 07 15:41:47 2020

To: 'DAVID CHRISTENSEN'

Subject: RE: 114 Robbins St. ROW Permit

Importance: Normal

 

Hello David,

As long as the water is ran through the meter, I fine with your Plumber connection to the back side for water access.

Regards,

Sam Miller | Sr. Engineer Tech.

City of Molalla

117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038

T : 503-759-0217 | E: smiller@cityofmolalla.com

From: DAVID CHRISTENSEN <dnc727@gmail.com>

Sent: Wednesday, October 7, 2020 12:21 PM

To: Sam Miller <smiller@cityofmolalla.com>

Subject: Re: 114 Robbins St. ROW Permit

On a side note can we get a hose connection at the water meter. I was told to talk to you.

On Wed, Oct 7, 2020, 12:19 PM DAVID CHRISTENSEN <dnc727@gmail.com> wrote:

We are held up by PGE. They were 4 to 6 months to move the pole, we are now at 4 months. I guess I was unaware about a time on sewer connection. All permits are active with regular inspections. We are at finish sheetrock on interior walls. Thanks David

On Wed, Oct 7, 2020, 11:34 AM Sam Miller <smiller@cityofmolalla.com> wrote:

Good Afternoon David,

Just following up with the Public Works Permit PW28-2020. Wondering where we sit for completion. Permit expired back on 9/30/2020. I haven’t received any inspection requests for sanitary sewer connection with cleanout, water service, relocation of utility pole, Storm weep hole or sidewalk replacement. Let me know if you need more time. I can give you a onetime extension on the permit. Thanks.

Regards,

Sam Miller | Sr. Engineer Tech.

City of Molalla

117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038

T : 503-759-0217 | E: smiller@cityofmolalla.com

From: DAVID CHRISTENSEN <dnc727@gmail.com>

Sent: Thursday, April 16, 2020 10:30 PM

To: Sam Miller <smiller@cityofmolalla.com>

Subject: Re: 114 Robbins St. ROW Permit

Great, thanks!

On Thu, Apr 16, 2020 at 11:17 AM Sam Miller <smiller@cityofmolalla.com> wrote:

Hello David,

I’m doing well, thanks for asking. Hope everything is going good for you too.

The job site looks great. Your good to proceed on my end. Let me know if you have any question. Thanks.

Regards,

Sam Miller | Sr. Engineer Tech.

City of Molalla

117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038

T : 503-759-0217 | E: smiller@cityofmolalla.com

From: DAVID CHRISTENSEN <dnc727@gmail.com>

Sent: Wednesday, April 15, 2020 8:21 PM

To: Sam Miller <smiller@cityofmolalla.com>

Subject: Re: 114 Robbins St. ROW Permit

Hi Sam,

Hope all is good with you. The 114 Robbins St. project is ready

for your inspection for silt barrier and bio bags around the

street drain and driveway. Fencing is up but not locked. Feel

free to go in.

Thanks David

On Mon, Apr 6, 2020 at 2:59 PM DAVID CHRISTENSEN <dnc727@gmail.com> wrote:

Sounds good.

On Mon, Apr 6, 2020, 2:54 PM Sam Miller <smiller@cityofmolalla.com> wrote:

Good Afternoon Ron,

See attached file for your records.

Dave,

I will need to be notified 24 hours in advance to inspect erosion control and before starting of construction. Please let me know if you have any question. Thanks.

Regards,

Sam Miller | Sr. Engineer Tech.

City of Molalla

117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038

T : 503-759-0217 | E: smiller@cityofmolalla.com