From: Seth P
Sent: Wed Mar 06 15:40:17 2019
To: Gerald Fisher
Cc: Andy McBride
Subject: RE: Bently Feed Drawings
Importance: Normal
Attachments: image001.png; image003.gif; image004.png; image006.png; 2019-03-06 Stamped Calculations.pdf; Gerald- As promised here are the calculations. Thanks again Seth Pownall Project Manager Cascade NW Construction sethp@cascadenwconstruction.com 801 E. Main St. Molalla, OR 97038 | O: 503.919.2201 | C: 971.272.4925 OR CCB #201730 | WA #CASCANC821BR | OEC 408 COMMUNICATION From: Gerald Fisher <gfisher@cityofmolalla.com> Sent: Wednesday, March 6, 2019 3:05 PM To: Seth P <Sethp@cascadenwconstruction.com> Cc: Andy McBride <AndyM@cascadenwconstruction.com> Subject: RE: Bently Feed Drawings Thanks Seth. Regards, Gerald Fisher, P.E. | Public Works Director City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.829.6855 | Direct: 503.759.0218 CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you. From: Seth P <Sethp@cascadenwconstruction.com> Sent: Wednesday, March 06, 2019 3:01 PM To: Gerald Fisher <gfisher@cityofmolalla.com> Cc: Andy McBride <AndyM@cascadenwconstruction.com> Subject: Bently Feed Drawings Gerald- Thank you for your help. Attached is the drawings for the shoring of the front wall. Ill send the structural calculations as soon as I get them. It should be within the hour. Regards, Seth Pownall Project Manager Cascade NW Construction sethp@cascadenwconstruction.com 801 E. Main St. Molalla, OR 97038 | O: 503.919.2201 | C: 971.272.4925 OR CCB #201730 | WA #CASCANC821BR | OEC 408 COMMUNICATION