From: Seth P
Sent: Thu Mar 07 14:55:19 2019
To: Gerald Fisher
Cc: Andy McBride
Subject: RE: Bentley Feed Drawings
Importance: Normal
Attachments: image001.png; image005.gif; image002.png; image003.png; Gerald- Thank you for sending that to the county. I have submitted the plans and they said the permit should be ready for me tomorrow. We will certainly repair the holes as stated. Thanks again for your help, Seth Pownall Project Manager Cascade NW Construction sethp@cascadenwconstruction.com 801 E. Main St. Molalla, OR 97038 | O: 503.919.2201 | C: 971.272.4925 OR CCB #201730 | WA #CASCANC821BR | OEC 408 COMMUNICATION From: Gerald Fisher <gfisher@cityofmolalla.com> Sent: Thursday, March 7, 2019 2:47 PM To: Seth P <Sethp@cascadenwconstruction.com> Cc: Andy McBride <AndyM@cascadenwconstruction.com> Subject: RE: Bentley Feed Drawings Hi Seth, The forms were sent in to the County Building Dept so they could process you plans. Attached is a right of way permit for removal of the temporary braces and I provided 60 days on the permit which should provide you with enough time. Once your internal bracing is set and external removed, we will inspect the curb for damage. If the curb is OK then we will need you to clean out the holes of loose debris, grout the holes with non-shrink grout, and broom finish the top to match the existing curb as much as possible. Let me know if you have any questions. Thanks. Regards, Gerald Fisher, P.E. | Public Works Director City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.829.6855 | Direct: 503.759.0218 CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you. From: Gerald Fisher Sent: Wednesday, March 06, 2019 3:05 PM To: 'Seth P' <Sethp@cascadenwconstruction.com> Cc: Andy McBride <AndyM@cascadenwconstruction.com> Subject: RE: Bently Feed Drawings Thanks Seth. Regards, Gerald Fisher, P.E. | Public Works Director City of Molalla 117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038 Office: 503.829.6855 | Direct: 503.759.0218 CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you. From: Seth P <Sethp@cascadenwconstruction.com> Sent: Wednesday, March 06, 2019 3:01 PM To: Gerald Fisher <gfisher@cityofmolalla.com> Cc: Andy McBride <AndyM@cascadenwconstruction.com> Subject: Bently Feed Drawings Gerald- Thank you for your help. Attached is the drawings for the shoring of the front wall. Ill send the structural calculations as soon as I get them. It should be within the hour. Regards, Seth Pownall Project Manager Cascade NW Construction sethp@cascadenwconstruction.com 801 E. Main St. Molalla, OR 97038 | O: 503.919.2201 | C: 971.272.4925 OR CCB #201730 | WA #CASCANC821BR | OEC 408 COMMUNICATION