From: Gerald Fisher

Sent: Wed Mar 01 16:31:58 2017

To: Brenda Reiner (Molalla)

Subject: FW: 100 Stowers Street, Molalla- Sidewalk

Importance: Normal

Attachments: ADAR_Inspection_Form_v1.pdf; 20170301144635724.pdf;

 

FYI

Regards,

Gerald Fisher, P.E. | Public Works Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.6855 | Direct: 503.759.0218

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: KIEFFER Loretta L [mailto:Loretta.L.KIEFFER@odot.state.or.us]

Sent: Wednesday, March 01, 2017 2:41 PM

To: ncam10@msn.com; CHRISTOPHER Basil R <Basil.R.CHRISTOPHER@odot.state.or.us>

Cc: NICHOLS Marlene T <Marlene.T.NICHOLS@odot.state.or.us>; Gerald Fisher (gfisher@cityofmolalla.com) <gfisher@cityofmolalla.com>; KRETTLER Lawerence A <Lawerence.A.KRETTLER@odot.state.or.us>

Subject: 100 Stowers Street, Molalla- Sidewalk

Alliks, Please go to RD755, RD756, RD757 and RD759 for standard drawings for ADA ramps at link below. Please see attached form for what ODOT uses to inspect ADA ramps.

https://www.oregon.gov/ODOT/HWY/ENGSERVICES/pages/roadway_drawings.aspx#Roadway_700_-_Curbs,_etc.

Basil, Please see attached drawing. According to the drawing the sidewalk will be around 7.5 % grade. Will this be a problem?

Larry, Do you see any problems?

From: Ncam 10 [mailto:ncam10@msn.com]

Sent: Thursday, February 23, 2017 3:48 PM

To: NICHOLS Marlene T

Subject: Re: 100 Stowers- Sidewalk

Hi Marlene,

We have been coordinating with City of Molalla and need someone from ODOT to assess the sidewalk for the above address.

They have said that there is a question of the existing sidewalk leading up to the ADA Ramp where it needs to be poured.

The grade percentage seems to be slightly off and I would like to meet with someone to see if it meets ODOTs approval.

City of Molalla said that if ODOT approves the existing sidewalk, then we can complete the process for the ADA Ramp and pour.

Please let me know when we can set up a meeting.

Thank you,

Alliks Cam

503871 3850


 

From: NICHOLS Marlene T <Marlene.T.NICHOLS@odot.state.or.us>

Sent: Friday, February 3, 2017 8:17 AM

To: 'Gerald Fisher'; 'Ncam 10'

Subject: RE: 100 Stowers- Sidewalk

Alliks, Please submit a plan sheet showing grade percentage on each location of the ADA Ramp. I will need to submit it to our Region 1 Tech Center for engineering review.

Marlene T. Nichols

District 2C - Permit Specialist

999 NW Frontage Road, Suite 250

Troutdale, Oregon 97060

Ofc: (503) 665-4006; Fax: (503) 665-4487

From: Gerald Fisher [mailto:gfisher@cityofmolalla.com]

Sent: Wednesday, February 01, 2017 3:52 PM

To: Ncam 10

Cc: NICHOLS Marlene T

Subject: RE: 100 Stowers- Sidewalk

Hi Alliks,

Please coordinate with ODOT for the permit to complete this work. You will need to work directly with Marlene Nichols. Here number is 503.665.4006.

Regards,

Gerald Fisher, P.E. | Public Works Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.6855 | Direct: 503.759.0218

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: Ncam 10 [mailto:ncam10@msn.com]

Sent: Tuesday, January 31, 2017 12:53 PM

To: gfisher@cityofmolalla.com

Subject: 100 Stowers- Sidewalk

Hi Gerald,

Sorry for not getting back to you sooner.

I have finally scheduled the prep and pour for the completion of the sidewalk at 100 Stowers.

I will be scheduling an inspection next week, weather permitting and will keep you updated.

Thanks Alliks