From: George Snegirev
Sent: Wed Mar 03 16:27:34 2021
To: Gerald Fisher
Subject: 220 W Main Street
Importance: Normal
Gerald
This is in regards to the Transportation Analysis Letter for the development at 220 W Main Street.
The first question is to see if it qualifies for the Letter rather than the full study.
An example shown in the development code is that the threshold for the letter is a subdivision containing 25 or fewer single-family residences or a general office building less than 15,000 square feet. Is the 15,000 square feet for the building the square footage for the proposed new building or the combined square footage of the buildings on site.
The next question is the requirements of this letter. I can produce most of the documentation required for this letter except the trip generation numbers. To acquire the necessary manuals and applications will cost in the vicinity of $1,000-$1,200, that is more than I am willing to pay for what will probably be a one time use, plus the learning curve required to figure this out. Would it be more efficient and cost effective if we hire a transportation engineer to do this letter for us.
I look forward to your response and comments
Thank you very much
George Snegirev P.E.
503 807 5048