From: Dan Zinder
Sent: Wed Jan 13 13:13:09 2021
To: bill@bniconst.com; George Snegirev; Tony Brooks
Cc: Mac Corthell; Gerald Fisher
Subject: RE: Plans for B&I Construction Inc Phase 1
Importance: Normal
Attachments: image001.png; Molalla Municipal Code (Molalla, OR).pdf; approval criteria.pdf; Hi Bill, I took a closer look at the lot configuration and it looks like original Plat lines still exist on the lot. The proposed buildings would overlap these lines so a simple taxlot adjustment wouldn’t be possible in that case. As you likely know, the lot line history is a little complex on your properties so I’m going to get in touch with the surveyor to ensure that the original plat lines are what they look like they are. Sorry to get your hopes up on the plat option. I think it would make sense for us to sit down sometime in the near future to discuss re-platting options and how that would play into the overall subdivision. Do you have available time Monday or Tuesday afternoon of next week? I’ve attached the submission requirements and approval criteria for site design review. Applicable criteria (for narrative) would also include: 17-3.2.040 Non-Residential Buildings *17-3.2.050 Civic Space and Pedestrian Amenities *if gross leasable space is over 10,000 sqft. Last, do you have a breakdown of proposed square footage by use? That would help us determine what, if any, traffic analysis is required. Thank you, Dan Zinder 503.759.0226 Bill, Thanks for the update. Jan 6 meeting is still possible but at this point, I don’t want to make any promises towards that meeting, particularly with the holidays looming. Our noticing requirements give a very tight window for a completeness determination (pursuant to the submission standards of chapter 17-4.2.040 Application Submission Requirements for site design review. It is possible but at this point imo, the objective should be to turn in an application that meets completion criteria and we can make the determination from there. Best, Dan Zinder 503.759.0226 From: bill@bniconst.com <bill@bniconst.com> Sent: Wednesday, January 13, 2021 10:20 AM To: communityplanner@cityofmolalla..com Cc: Dan Zinder <dzinder@cityofmolalla.com> Subject: Plans for B&I Construction Inc Phase 1 Please see attached digital copy of plans. Thank you Bill Egoroff 220 W Main St/Po Box 246 Molalla, OR 97038 Cell: (503)-545-0338 This email message, including any attachments, is for sole use of the intended recipient and may contain confidential and privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply email and delete the original and all copies of this email.